HomeMy WebLinkAbout2002-03-07 NAC MemorandumMEMORANDUM
TO: Kimberly Kamper
FROM: Scott Richards
DATE: March 7, 2002
BACKGROUND
Adjacent uses to the subject site are listed below:
NORTHWEST ASSOCIATED CONSULTANTS, NC
5775 Wayzata Boulevard, Suite 555, St Louis Park, MN 55416
Telephone: 952 .5915.9 Facsimile. 96255837 pig nner P r ac lannir g.cor
RE: Oak Park Heights — Oakgreen village villas -- PUD/CUP
Concept Plan Review
FILE NO: 798.02- 02.03
Valley Senior Services Alliance, Inc. has made application for a PUD/CUP Concept
Plan review for property north of the Xcel Energy power line easement within the
Central Business District. The area consists of 6.84 acres. A total of 24 dwelling units
would be proposed within three 8 -plex buildings. The project is proposed in three
phases, starting in 2002 and ending in 2005.
A Planned Unit Development Concept Plan review is required for townhouse projects
proposed on private streets and where more than one principal structure is located on a
parcel. The property is zoned CBD in which multiple family townhouses are a listed
conditional use.
North of Site: Present zoning -- CBD, Present Use — Existing commercial
development.
South of Site: Present zoning — CBD, Present Use — Xcel Energy power line
easement, former auto salvage yard and open space.
West of Site: Present zoning — CBD, Present Use — Xcel Energy substation and
open space.
East of Site: Present zoning — CBD, Present Use — Residential condominium
development.
Attached for Reference:
Exhibit 1
Exhibit 2
Exhibit 3
Exhibit 4
Exhibit 5
Exhibit 6
Exhibit 7
Exhibit 8
Exhibit 9
Exhibit 10
Exhibit 11
ISSUES ANALYSIS
Vicinity Information Plan
Existing Conditions Plan
Overall Area Plan
CBD Master Plan /CBD Master Plan Precincts
Conceptual Master Plan
Land Use and Staging Plan
Conceptual Grading and Drainage Plan
Landscaping Plan
Building Elevation Plans
Floor Plans
Lighting Plans
Comprehensive Plan. The subject site is designated as CBD in the Comprehensive
Plan. The plan anticipated a mixture of commercial and residential uses within this
area. The Central Business District Urban Design Study included the subject area in
the Medium Box Mixed Use Precinct and the Public Green Precinct. The subject area
north of the xcel Energy power line easement was designated for a commercial
development area. The Master Plan was developed as a concept or guide for land use,
thus it is recognized that the plan is flexible. If residential development occurs in this
area, it could preclude redevelopment of the Highway 36 frontage road area for
commercial uses in that the potential business area would be reduced by the housing
development. The Planning Commission should consider this deviation from the Master
Plan of the CBD Design Guidelines.
Zoning. The subject site is proposed to remain zoned CBD. The multiple family
townhouse units proposed for this subject site are allowed in the CBD as a conditional
use. A PUD is required to allow for the three principal structures on one lot. A PUD is
also required to allow for private street access for the project.
Subdivision. The general area is proposed to be subdivided to create the subject
property and the surrounding townhouse and apartment lots. A preliminary plat has
been submitted and will be processed with the General Plan of Development review and
approvals.
Proposed Project. The project as planned would consist of 24 units in three 8 -piex
buildings. The project density is proposed at 3.51 units per acre. The subject area
would be accessed by one private street that would extend from the roadway within the
Oakgreen Village Townhomes. From the private street, driveways would access all of
the garage units in the development. A small playground area is included on the plan.
Oakgreen Village Villas PUD /CUP Concept Review
Planning Report
Page 2
The units are surrounded by an electric substation, commercial development, residential
condominiums and a major power line easement. There are few natural or man -made
amenities on or surrounding this site.
Streets. As indicated, only one access, on a 25 foot private street, is proposed for this
development. The southerly portion of the development would be approximately 400
feet from the private street within the Oakgreen Village Townhomes. Staff's initial
reaction is that another access, possibly from the west would need to serve the housing
development in this area.
The Planning Commission and City council should review the proposal for the deadend
private street and the access issues. The design standards of the CBD Design
Guidelines should also be considered in reviewing this proposal.
Building Orientation/Project Location. Most of the site would be consumed with
buildings and driveways. There is little room on the site to alter the design with the
units that have been proposed. Staff has questioned, based upon the CBD Urban
Design Study that designated this site for commercial development, whether this is an
appropriate location for residential units. The subject site is too detached from the other
development and the orientation of the buildings does not relate well to what is currently
surrounding the property. This site may be better suited for commercial development.
Park Dedication. Park dedication is based upon the specifications of Section 302.08
of the Subdivision Ordinance. For a project with an overall density of 3.51 units per
acre, the dedication would be 10 percent of the land or an equal amount in cash. The
applicants have offered the Xcel Energy easement area as a portion of the park
dedication.
The Parks Commission and City Council should review the proposal and provide a
recommendation on the type of dedication it would prefer for this area. If cash
dedication is required, the applicants must provide an appraisal or purchase agreement
in accordance with the Ordinance to establish a fair market value of the property.
Grading and Drainage. Conceptual grading and drainage plans have been submitted
for this project. The subject site is located in an area identified within the City's
stormwater plans for a pond. The City Engineer should comment on the plans and
indicate how the project will impact those stormwater plans. The CBD Master Plan
indicated ponding areas to be located to the south of this site, within the Xcel Energy
power line easement. Drainage plans and calculations would need to be submitted for
review and approval of the City Engineer and for review by the applicable watershed
authority.
Utilities. A utility plan has not been submitted. The City Engineer has requested that
the developers provide a conceptual utility plan for this site and as it will impact the
other aspects of the entire development.
Oakgreen Village Villas PUD /CUP Concept Review
Planning Report
Page 3
Trails and Sidewalks. The site plan does not indicate any trails or sidewalk areas to
the subject site. At a minimum, a sidewalk would need to be placed adjacent to the
access roadways for pedestrian access to the site. Trail interconnections with the
commercial areas to the north and to the condominiums to the east would also assist in
breaking down the isolation of a neighborhood in this location.
The Parks Commission should comment on the specific trails and sidewalks for this
project, as well as the overall plan for the entire housing complex.
Lighting. A site lighting plan has been submitted as part of the application.
Consideration of the lighting plan would be a part of the General Plan of Development
approvals.
Landscaping. The City Arborist has made preliminary comments on the landscaping
plans for the Oakgreen village villas. Of particular importance is the need for a Tree
Inventory and Tree Protection Plan for the subject property. These plans will need to be
submitted before the Arborist can complete a review.
Architectural Appearance. Elevation plans for the three buildings have been
submitted for review. The plans feature two -story units with porches and front facing
garages. The units are a "suburban style" design that do not meet the intent of the CBD
Design Guidelines and the intended housing styles preferred for the CBD.
A complete analysis of the guidelines would be completed as part of the General Plan of
Development review.
Development Contract. The applicants will be required to enter into a development
contract with the City should approval of the Concept Plan and General Plan of
Development be granted. As part of the contract, the provisions for street and utility
construction, as well as payment for area charges, would be included.
RECOMMENDATION AND CONCLUSION
Based on the preceding review, it is recommended that the Planning Commission hold
on a recommendation at this time. Issues have been raised about the desirability of this
location as a residential neighborhood, street access issues, utility issues, and
stormwater design. The development of the subject site will also be influenced by the
proposed projects to the south of the Villa development. Alt of the elements related to
access, streets, utilities, and stormwater will need to be coordinated for the proposed
project.
pc: Kris Danielson
oakgreen Village villas PUDICUP Concept Review
Planning Report
Page 4
.00C a . I a1r2e
MI RI.
ate PPM
ZOOZ /ZZ /ZO Airp
R018L1R71
pZ10 - ZOL :x1, 1...
- 1.1.
_ 0
>Iv5
taH
:4041a, ta
f &WIWI IR SOVegtt —ril 84041-N-519
v 0 = � . y 1 " itiV ° .v S1VI3OSSV }faANS
8 311S — S1N3WIUVdV 39V11IA N331191Vo — JN1aNV1 T13M1noe
N.
4
•
SNV`ld
NOI1VINUOjNI AlINI3IA
e; = ■ rwsa�ir�= „uocw� ■a
0 1, J° nails -a
PZIa -ZOL
J "lil PPId MU / ZO .0. air :uxla�uyoay
.09
ae
:III Wi�Ka
NOSS
:aaau111u
ros 9 vmai as a turn r EIYLY I ELM v 01.,U2$xN!v S1Vl3OSSV D HcJANS
NVld SNOIjI13No3 DNIISIX3
El 31IS - S1N31N.LU 'dtV 391/11IA N331 9NVO 9NIONb'1 s113M..nva
1
1
1
1
•
1
C
w
A
.11.mit • 1.1 ism a me s mi or • 'on imp ta
n
III
1
0
IF ,R
•
el I
w
9
e"
ai_
o z
D �
3
co
EXHIBIT 4
41-
' Nu. 741,' ay'
I 4:$ afr
1..
i\NVOION‘.;:i4S1 ` NNW il
7 1aN is
- -
Ih
ri
$70
ZT
fiTi - CIC L�GSq-yYY�ly i .41-1461 Y
i4i P YM.G 6Q5� 31' 43 1 CU Yltpt `3WWNYLLV ` gen Ykfl ,[H7][►IY S3IVJOOSSV 2 8ANS
01 1° g s
x+19 ?PIA
,49 ; „ l °spa
Z°°ZIZZ /ZO A a
-
:oH
0 I0- 00 i vr1 w•ri
as
or
iur121ug74y
tia
3116 -° SINI1/1118bdv 39V N338D )IVO -- DN1dNV1 s113NU1108
[p•l7PO
NNN'1 �'"]_
Nbld k 31SV N 1Vf]1d3NO3
;—
co
1
•
z
w
0
w
+ecs ru�:c ys ss= to sto wits
+mo : r r � a � ' . t rwa ua i is vKn " S1VI3OSSV U3OANS
T'yC V�
C7 D b
C] b Q
N N ry
31IS S1/1 3M MIA NN] IHD) VO -- DNICINV1 S I13Minoe
II
0
U
+NO.S sv+SKYdd 0 31 3 ,SLL
NVId DNOJV!S ❑NV 3Sf7 ❑NV1
Hfl ON 3f1N3A1/ Na3110 NVO
0
v
O N
301 )" -a �H «u�srit�
.� � o�� S3IVI3OSSVflOANS
++ v smays I r►►ot .n►r zcors v►�ai'u.xr
.09 - .►
is awn
NVld 3JVNIVJQ ❑NV 9NIGVHD 1Vnid33NOD
El 311S - SVTI1A 39V N33119NVO ° ONIONV1 S11]M11108
err Pt►
ix
►o- Zia i wu s++a
dir
•
O
r-
Samda,..dia
rs.
Pia
0' tl, i
,
z
6' -3 t- 5 O
0 -
e a k ,
.....= 0 --1 3 k ... 4 el
,, f( g
c0
t1.
.,r
saw
■
mommormirm arm
mon pip■N ron arm
swim mom � � r T i a a p■
C.. . /f az r
■■■ ■ ■ ■..ii v ■.m
..■ ...■..■ ■■m.•.■■
00
00
00
as
0000
ODD]
000
000
000❑
0000
0000
0000
DDD
000
000
0000
0000
0000
0000
1.1 lil IMI
040
�ca - I Lb'Ci
�,r -y
y
C' J Y a L NIT7 Q ❑
IG
ON loaroald
1111111111111}
r: :m
MMM
qin
is N
■
VIM
11 C9
r
hi
iii 'S .H 1 H >lelVd
1
sd77in
Na3ell �I70
ca
T
vI
6ld Z9: b0 :Z0 ZO /OC /L0 1 6m ue}d\uaneauasaJd‘s)y&ia 4 >ped yep - se11!n uaaJo )e❑ OVS
Aid
0
S1.H913H SAlVd xy0
�NlaN�i s oa
Z
o- 9
mtLmL
s it s
amyl wawa '"' OJAI*
I NTIONTEEMEMMIMM
MI NEMER MilrEffin ME
MEMOS MI !ME
IMMINIEMMEM AMON 3
mismilismarffeappmm
...mmin...m mom
mum..
SVC'
:1 1 11'v�d
110 ON larONd
NCI > d >IVO
SV`771n
Nat o
•
Mi
H itt
—1
•
111
•
M —
=mom Inn—
•
•
=Mon{
MCA ,,,,,.
•
‘t,.s w
4g
Dra
AIM
II!
P
❑L
❑P
❑L
or
■ v
or
AIM
aim I 1 I II i����������� i C
I 1 1 17111111111
ommun
41.
ruE
__1111[19zoil
X4 Fen
F- L
2 1
01- 7.0/0111-.0 ` lr'+ p' Ll ?lCi\uol)L]llosaid‘S]ela }-{ Il?O - ua1J ),{1 Q 1 [01,S
....■■.■ ■ ■EWS�MT
i �uu■■■■u . rr r �� lI! J + _ r r ■ ■i �i
T immidatmmultommumm ■ ■■■■■■ r. ■ ■il
■_■■
u i ■■■■mu■■ ■i
aucia
cia>oAHo
svci '.L9 NIIIG�d
19I 'ON .1.51'0a=1
S'dl'II�
t\iaNID >
Ci
V!
10
Wd L L •t7L:ZD ZDIo01 -0 ' 6MQ 'lleldlilol ;que50ia15iii61 41 71J[?d )12O - SEI !A ueeio >le0 1.91.01 -S
a
1
1
1
14
10
ri
r. .
r
VIOSJ N NIW 'S1H DIJ H ) IVd >IVO
A INfiNNOJ %JIM 'iOINGS
ENI❑NV1 S11AMa1f1O8
-_ -- L � ill„I(i„fll.11lll„ �
(tLLWfl.!JIii]I1.11 N11 � I ti
'
e
s t t
c °¢
Ei
W