Loading...
HomeMy WebLinkAbout2012-06-13 OPH Ltr to White Pine Construction Re Permit 2012-00020 CITY OF OAK PARK HEIGHTS t: 14168 Oak Park Boulevard No. • P.O. Box 2007 • Oak Park Heights, MN 55082 -2007 • Phone: 651/439 -4439 • Fax: 651/439 -0574 June 13, 2012 Alex Johnson White Pine Construction 1055 Antler Harris, MN 55032 Re -roof Permit # 2012 -00020 Dear Mr. Johnson, On June 12, 2012, I conducted a final inspection at 15018 64 St. N., which I failed. I need the following: 1) Photos of the sheathing and ice and water installation. 2) On the Northeast eave of the home it appears that the sheathing is well above the fascia, providing an open space to the attic. If this is the case the area must be closed off. A site inspection is required to verify the condition of item number two. You will need to provide a latter long enough to reach the fascia of this two story building. Compliance to these requirements is to be met within thirty days of the date of this letter, or the City shall have no alternative than to take further action to resolve this issue. Please contact me if you have any further questions. Sincerely, . im Butler Building Official CC: Owner, Bank of New York Mellon Trs. 7105 Corporate Dr. # PTX — C35 Plano, TX 75024 -4100 Tree City U.S.A.