Loading...
HomeMy WebLinkAboutBP 2003-00419 New Construction - Walgreens taNcity of Oak Park Heigh' METER NO: 1 -. 38 Oak Park Blvd. N. # \ 07 PERMIT No.: 0300419 Oak Park Heights, MN 55082 -2007 651/439 -4439 FAX: 651/439- 0574 ISSUED: /18/2003 Address 6061 Osgood Ave N PIN :33- 030 -20 -44 -0020 Legal Desc Subdivision MC MILLAN & COOLEY'S ADD :Lot 11 Block 6 Parcel Permit Type :Building Property Type :Commercial Construction Type :New Construction Activity Valuation :$1,132,000.00 Water Meter Fee $766.00 NOTE: CONSTRUCT PER APPROVED PLANS. MUST COMPLY WITH ALL MN STATE BUILDING CODE REQUIREMENTS AND ALL CITY ZONING ORDINANCES. PERMIT ISSUED FOR CONSTRUCTION OF WALGREEN'S PHARMACY. PERMIT INCLUDES CHARGE FOR 1 1/2" WATER METER (IRRIGATION) AND 3/4" WATER METER (DOMESTIC) & RADIO. OWNER BUILDING PERMIT FEE UBC TABL $6,090.55 Net Lease Development Llc PLAN CHECK- BUILDING $3,958.86 50 6th St S STATE SURCHARGE- BUILDING $552.80 Suite 1480 WATER METER $766.00 Minneapolis, MN 55402- Total $11,368.21 APPLICANT Paid with check # 3609 NET LEASE DEVELOPMENT LLC 50 6th St S SUITE 1480 Minneapolis, MN 55402 - AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to : (1) the conditions of this permit; (2) the approval plans and specifications; (3) the applicable city approvals, Ordinances, and Codes; and, (4) the State Building Code. This permit is for only the work described, and does not grant permission for additional or related work which requires separate permits. This permit will expire and become null and void if work is not started within 180 days, or if work is suspended or abandoned for a period of 180 days any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the Minnesota State Building Code. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.