Loading...
HomeMy WebLinkAbout2006-07-21 BRRA Project Status UpdateJulie Hultman From: Long, Chris W [clong@bonestroo.com] Sent: Friday, July 21 2006 8:28 AM To: Eric A. Johnson; Tom Ozzello; Judy Hoist; Julie Hultman; Jim Butler; Erickson, Karen S; Post ler, Dennis M Cc: Hanson, David D; Kelley, Brian Subject: OPH Project Status Updates Novak Avenue North/Norwich Avenue North: • The sanitary sewer and water main are complete on Novak and Norwich. • The storm sewer is currently being installed and should be finished early next week. • Both streets are expected to be ready for aggregate backfill late next week. Project Issues: • Electrical concrete conduit in conflict with SS-8 and stub - The conduit is scheduled to be located on Monday morning. Following the Locate, decisions can be made in resolving the conflict. • Overhead power ines and poles have not been removed - Art Neilson, with Excel, is working on this issue, but said it may take some time before they can be removed. Pine Grove Gardens: • All utilities are complete. Approximately 75% of the concrete curb is complete. The remaining B618 concrete curb should be completed today. • The curb will be backfllled on Monday. • The streets are expected to be paved by late next week. Wal-Mart: • The water main connection on 58 Street was completed by wet tap yesterday. Lowes: • All three fill sites are currently being used by Frattalone (Node — 2 sites, CSM — 1 site). All silt fencing surrounding these sites is to specification. • Vosson Plumbing is on-site installing the internal utilities for the R.J. Ryan/CSM site east of Applebees. Oakgreen: • Expected construction start date: end of August/early September. Let me know if you have any questions or concerns. Thanks. Chris Long Bonestroo, Rosene, Anderlik & Associates Phone: 651-492-7747 8/7/2006 Page 1 of 1