Loading...
HomeMy WebLinkAbout2006-08-18 BRRA Project Status UpdateJulie Hultman Fronm. Long, Chris VVkclong©bones1roo.00ml Sent: Friday, August 18, 2006 11:37AM To: Eric A. Johnson; Tom Ozzello; Judy Hoist; Julie Hultman; jbutlergcityofoakparkheaights.com; Erickson, Karen S; Poet ler, Dennis M Co: Hanson, David D; KeUey, Brian Subject: OPH Project Status Updates Page 1 of Novak Avenue North/Norwich Avenue North: • All utHities are complete. • Snd ond grav& is complete on Novak. • The concrete curb and gutter along with the concrete driveway aprons on Novak are complete except for the two driveway entrances on the west side of Novak leading into Lowes. These driveways will be compFeted early next week. • Boulevard grading is currently occurring with the curbs being backfihled. • Sand and gravel placement on Norwich will not begin until Monday. The sand and gravel will only be placed to station 4+50 until the revisions between WaI-Mart and Lowes are approved. • The excavation for trails on Novak will begin next week. • A bacterJa test remairs to be done on Novak. Pine Grove Gardens: • All utilities are complete. • An inspection of the utilities will be cornpleted in the next few weeks. • Home construction has begun. • Wear course is not expeoted until after home construcbon. Lowes: • The water main loop around the Lowes has passed a pressure test. The conductivity and bacteria test remain to be done. • The sanitary sewer leading into Lowes from MH-3 on Novak has passed all required testing. Oakgreen: • The project was bid today with a low bidder of MiHer Excavating, • Expected construction start date: end of August/early September.