HomeMy WebLinkAbout2005-05-05 NAC Planning ReportPLANNING REPORT
TO: Eric Johnson
FROM: Scott Richards
DATE: May 5, 2005
RE:
FILE NO: 798.02 -- 05.01
BACKGROUND
The City Council, at their April 12, 2005 meeting, voted to reconsider their vote of March
29, 2005 to deny approval of the Pine Grove Gardens rezoning and Comprehensive
Plan amendment. The Council redirected the application to the Planning Commission
to allow the applicant to redesign the site plan so that it would be more compliant with
the R -3 District standards.
The applicant has requested a Comprehensive Plan amendment, rezoning, preliminary
and final plat, and planned unit development (PUD) for the 26 unit townhome project to
be known as Pine Grove Gardens. The site is 4.4 acres in area and is located
northwest of City Hall, east of Oakgreen Avenue, north of 58 Street, and south of
Highway 36.
The applicant has applied for a simultaneous concept and general plan planned unit
development for this project and has provided the information to complete that review.
A portion of the exhibits will need to be updated to reflect the slight changes in the
overall site plan, but the information as attached is adequately complete to review a
concept and general plan PUD.
Attached for reference:
Exhibit 1:
Exhibit 2:
Exhibit 3:
Exhibit 4:
NORTHWEST ASSOCIATED CONSULTANTS, INC.
Cover Sheet /Perspective Drawing
Existing Conditions
Concept and General Plan (Updated)
Preliminary Plat
4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422
Telephone: 783.231 .2555 Facsimile: 763.231 .2 561 planners@ nacpla nn i ng. corn
Oak Park Heights — Pine Grove Gardens: Comprehensive Plan
Amendment, Rezoning, Preliminary and Final Plat, Planned
Unit Development
Exhibit 5:
Exhibit 6:
Exhibit 7:
Exhibit 8:
Exhibit 9:
Exhibit 10:
Exhibit 11:
Exhibit 12:
Exhibit 13:
ISSUES ANALYSIS
Grading and Drainage
Utilities
Layout with MnDOT 1 995 Highway Overlay
Landscape Plan
Landscape Details
Perspective Drawings
Floor Plans
Building Elevations (Updated)
Project Narrative
Comprehensive Plan. The Comprehensive Plan designates this site as R--B,
Residential business Transitional District. The purpose of this district is to allow for a
smooth transition from high intensity commercial to the low density residential use.
This is to be accomplished by allowing a mixture of medium density residential uses
with low intensity commercial uses.
The applicant is requesting the Comprehensive Plan to be changed to designate the
property as medium density residential consistent with the proposed development. I n
support of the request from the applicant, the following points could be made:
• Medium density development would complement the surrounding uses,
especially the single family development. If the property to the west is developed
as the Oakgreen Village, the medium density developments would complement
each other.
• Medium density residential development may have less of a negative effect on
the significant tree cover and wetlands than a commercial development would.
The property may also be appropriate for commercial development, especially if the
MnDOT roadway alignment is constructed as currently planned. The applicant has
submitted plans (Exhibit 3) showing the lot layout with the MnDOT 1995 proposed
Highway 36 alignment. The development has been planned so as to accommodate the
MnDOT design.
Before any consideration of the details of this project, the Planning Commission should
look at the overall land use issues of this site. The consideration should be based upon
the preferred long term land use of the property, the proposed plans of MnDOT, and the
current /proposed uses that surround the subject site.
As you are aware, the Planning Commission, at their March 10, 2005 meeting, voted to
approve the Comprehensive Plan amendment to medium density residential and a
zoning change to R -3, Multiple Family Residential District.
2
Zoning. The subject site is currently zoned Open Space Conservation. The purpose
of this district is to allow suitable areas within the City to be retained and utilized for
open space purposes and also as a "holding" zone for annexed lands.
The applicant is requesting that the site be rezoned to R -3, Multiple Family Residential
District. The rezoning could be consistent with the transitional nature of this property
and with the potential Oakgreen Village to the west. Approval of the proposed zoning
would be subject to the amendment of the Comprehensive Plan to a residential use.
Project Description. The request is to construct a total of 26 units in five townhome
buildings. The project has been designed with private driveway access from Oakgreen
Avenue. The project incorporates one story townhome units with a lower look -out level.
The plans indicate exterior landscaping and a trait connection to the City's trail system.
The project layout is nearly identical to what was originally reviewed by the Planning
Commission. The setbacks have been adjusted so that there are 30 foot front and rear
principal building setbacks, consistent with the R -3 District standards. The side yard
setback requirements of 10 feet are also compliant within the new plan. The private
roadway and driveway lengths have also been increased.
Planned Unit Development (PUD). A PUD is required to allow for a townhome
development on private access drives. The property would be rezoned to R -3 and a
PUD overlay would be applied with the appropriate development agreement.
Subdivision. A preliminary /final plat has been submitted for review. The property is
being divided into five blocks and a total of 26 lots. There are two outlots proposed —
one for the common landscape and street areas and the other in the northwest corner.
The City Attorney has reviewed the plat and has determined that the City would prefer
that the two outlots be merged into a single taxing parcel. The homeowners association
that is established should be responsible for the long term maintenance of this area and
for the taxes.
The plat incorporates a 50.02 foot right -of -way to the centerline for Oakgreen Avenue.
This is consistent with the recommendations of the City Engineer for Oakgreen Avenue
right -of --way requirements.
The plat, as presented, would comply with all of the basic subdivision requirements.
The final plat shall be subject to any comments or requirements of the City Engineer
and City Attorney.
Park Dedication. Section 402.08 of the Subdivision Ordinance requires a park land
and/or cash dedication for the proposed development. The purpose of the dedication is
to require new subdivisions to contribute to the City's park and open space system in a
rough proportion to the relative burden they will place upon the system. The ordinance
requires either land or a cash contribution in lieu of land or a combination of both be
dedicated to the City.
3
As the site is so small and not planned for a future park area, staff recommends the City
require a cash contribution in lieu of land The formula for cash contributions is
described in Section 402.08.D of the Subdivision Ordinance. Per the ordinance, the
applicant will need to provide the City with a property appraisal.
Lot Standards. The following table illustrates the lot requirements for the proposed R-3
District and level of project compliance:
R -3 DISTRICT STANDARDS
The project has been reconfigured so that all of the principal building setbacks are
complied with. The new plans reflect proposed decks on the easterly townhomes, and
decks and/or porches for the other units. The Zoning Ordinance allows for decks, not
more than nine inches above ground level, to be constructed into the setback area. The
proposed decks and porches would exceed the allowance of the Zoning Ordinance and
would need to comply with the 30 feet /10 feet requirements. The Planning Commission
can consider, as part of the PUD, an exception from this setback requirement. Staff
does not see an issue with that exception in that a minimum of 10 foot setbacks are
provided in those areas where these porches and decks are proposed. Additionally, the
potential for adjacent development is not significant in the areas that surround this
proposed development.
Access /Circulation. The site is accessed via a cul -de -sac off of Oakgreen Avenue
North. The private drive would be 26 feet in width. All maintenance would be the
responsibility of the homeowners association. Snow storage would be in those areas at
the ends of the private driveways. There may be some concern with the dead -end
design of the street network. The Police Chief and Fire Chief should comment on the
accessibility of the project for emergency vehicles.
One visitor parking area with nine spaces is provided on the site plan. Additionally,
each of the driveways in front of the two stall garages are 22 feet in length and will
accommodate additional guest/resident vehicles.
A trail access is planned to be constructed by the developer on the City property to the
east of the townhome development. The trait would access the private drive and
continue north to the trail within the Xcel trail easement and to the south to the access
drive for City Hall. The City Public Works Director has recommended the following
related to the proposed trail:
4
Standard
Proposed
Project
Lot Area
1 5,000 square feet
4.4 acres
Lot Area Per Unit
4,000 square feet
5,385 square feet per unit provided
Front Setback
30 feet
30 feet
Side Setback
10 feet
10 feet ++
Rear Setback
30 feet
20 feet principal 1 18 feet deck
Wetland Buffer
36 feet
41 feet
Building Height
35 feet
18 feet
As the site is so small and not planned for a future park area, staff recommends the City
require a cash contribution in lieu of land The formula for cash contributions is
described in Section 402.08.D of the Subdivision Ordinance. Per the ordinance, the
applicant will need to provide the City with a property appraisal.
Lot Standards. The following table illustrates the lot requirements for the proposed R-3
District and level of project compliance:
R -3 DISTRICT STANDARDS
The project has been reconfigured so that all of the principal building setbacks are
complied with. The new plans reflect proposed decks on the easterly townhomes, and
decks and/or porches for the other units. The Zoning Ordinance allows for decks, not
more than nine inches above ground level, to be constructed into the setback area. The
proposed decks and porches would exceed the allowance of the Zoning Ordinance and
would need to comply with the 30 feet /10 feet requirements. The Planning Commission
can consider, as part of the PUD, an exception from this setback requirement. Staff
does not see an issue with that exception in that a minimum of 10 foot setbacks are
provided in those areas where these porches and decks are proposed. Additionally, the
potential for adjacent development is not significant in the areas that surround this
proposed development.
Access /Circulation. The site is accessed via a cul -de -sac off of Oakgreen Avenue
North. The private drive would be 26 feet in width. All maintenance would be the
responsibility of the homeowners association. Snow storage would be in those areas at
the ends of the private driveways. There may be some concern with the dead -end
design of the street network. The Police Chief and Fire Chief should comment on the
accessibility of the project for emergency vehicles.
One visitor parking area with nine spaces is provided on the site plan. Additionally,
each of the driveways in front of the two stall garages are 22 feet in length and will
accommodate additional guest/resident vehicles.
A trail access is planned to be constructed by the developer on the City property to the
east of the townhome development. The trait would access the private drive and
continue north to the trail within the Xcel trail easement and to the south to the access
drive for City Hall. The City Public Works Director has recommended the following
related to the proposed trail:
4
1. There should be no T trail intersections. The connections to the Xcel easement
trail should be split with a V design and possible placement of a bench in the
middle area. The revised site plan has been changed to accommodate a V
design.
2. The south trail to the City Hall access roadway should be provided with a
crosswalk and pedestrian accessible ramps. This will be added as a condition of
approval.
3. The existing trail connection near City Hall could be abandoned with this
improvement. This will be a condition of approval.
Snow Removal. The applicant will be required to submit a snow removal plan that will
be subject to review and approval of City staff.
Grading, Drainage and Utilities. The applicant has submitted grading, drainage and
utility plans for City review as part of the original submittal. The project architect will be
required to update the plans to reflect the revised site plan.
The final grading, drainage and utilities plans are subject to review and approval of the
City Public Works Director and the City Engineer. The project should also be reviewed
by the Middle St. Croix Watershed District.
Landscaping and Tree Preservation. The applicant will attempt to preserve as many
significant trees as possible. The project architect will be required to update the
landscape and tree preservation plans to reflect the revised site plan. The final
landscape plan and tree preservation plans are subject to review and approval of the
City Arborist. A tabulated list of trees to be removed and preserved will be required by
the City Arborist to determine compliance with the Tree Protection Ordinance.
Signage /Lighting. The applicants are not including a development sign or monument
for this project. A lighting plan has been submitted that includes decorative lights for the
private drive. The private drive lights are shown on Exhibit 3. The applicants have also
included the building light fixtures on Exhibit 3. The fixtures are of a residential style
that is allowed. The applicant will be required to present a photometric plan subject to
City staff review and approval.
Building Design. The project would not be subject to the Design Guidelines of the
City. Other multiple family dwelling projects, as part of a PUD, have been required to
make adjustments in design and building materials as part of the approval process.
The applicant is proposing all garage forward design for the one story townhomes. Alt
of the buildings will have the same architecture. The Planning Commission should
comment on the garage forward design and general architecture. The proposed
building materials include architectural asphalt shingles, cultured stone and vinyl siding/
shakes. The City has required steel siding or concrete masonry board for other similar
projects. City staff would suggest the same requirement for this project. The applicant
5
will also be required to provide a materials board for review by the Planning
Commission and City Council.
Trash Handling. All trash removal should be through individual areas in the owners
unit. There are no centralized trash or recycling storage areas.
Development Agreement. A development agreement shall be required for this project
subject to review and approval of the City Council and the City Attorney. The City
Attorney requests copies of the homeowners documents and declarations for his
review.
CONCLUSION /RECOMMENDATION
The applicant has requested the following approvals to construct a 26 unit townhome
project on Oakgreen Avenue:
■ Comprehensive Plan Amendment to Medium Density Residential
• Zoning Amendment to R -3, Multiple Family Residential District
• PUD Concept and General Plan Approval
• Preliminary and Final Plat
The Planning Commission and City Council shall review the overall Comprehensive
Plan and zoning issues for this project before acting upon any PUD review. If mid
density land use is preferred, consideration of the zoning amendment, PUD, and
subdivision is appropriate.
City staff recommends approval of the project with the following conditions:
1. The final plat shall be subject to any comments or requirements of the City
Engineer and City Attorney. The City Attorney shall provide comment and
provide a recommendation on the proposed separate developable parcel
designated as an outlot.
2. The applicant shall be required to pay a cash park dedication fee based upon the
requirements of Section 402.08 of the Subdivision Ordinance. The applicant
shall provide the City with a property appraisal acceptable to the City Attorney.
3. The Planning Commission shall comment on allowing encroachments of decks
and three season porches into the required set backs as provided for on the
concept /general plan.
4. The Police Chief and Fire Chief shall comment on the accessibility of the project
for emergency vehicles.
5. The proposed trail locations and applicant's responsibility in construction costs
shall be subject to review and approval by the City Council.
6
6. The applicant shall submit a snow removal plan that shall be subject to the
review and approval of City staff.
7. The applicant shall provide updated grading, drainage and utility plans to the City
reflecting the revised concept /general plan. All final grading, drainage and utility
plans shall be subject to the review and approval of the City Public Works
Director and City Engineer and review of the Middle St. Croix Watershed District.
8. The applicant shall provide updated landscape and tree preservation plans to
reflect the revised site plan. The final landscape plan and tree preservation plans
are subject to review and approval of the City Arborist.
9. The applicant shall provide a photometric plan for the project subject to City staff
review and approval.
10. The Planning Commission should comment on the garage forward design,
general architecture, and building materials of the project. The siding materials
should be steel, concrete masonry board, or an equivalent material approved by
City staff.
11. A development agreement shall be required subject to review and approval of the
City Council and City Attorney.
12. The homeowners documents and declarations shall be provided to the City
Attorney for his review and approval.
7
gialitiffi.512.41222.' aglilaffir
• • •
c\1
• ••■,. •.•
, •
1PC5C., ,
— —1— —
I
2
D
Er rfr
S1551.1.11.001
Tv g
I_
j k
srpv O.., 5
9r*
•
• •
i g oTO
„POTO Si
L
ILLUON r QNIAV N
1
6
c
;.t1
c:4
n
;.L1
0
c *11
„<4
s �jD�
3 t�izN
t
0 • 0
r
Zi'BZZ
3 „171,6g.10 1
1
'
G4
•
W
g
sr• #ri
00,0L 3 ,1 S
�
111111 11111111
L p010e M
x S
$
A
8
tt
my 0
ti
8 r g
H
a
00 ZL
3,1 t.L &00S
. 10 fg.To
Tza
9r1'8; A K,r.zg•ro x
1,J [ LOP,/ --rnn r �r n V e r'_r ± r� J�r'
r ri r_ V1 v -, r1 v_.eJ I v r v33r...�: r v v
R a
oozy
�r`J
1
mu
1
3 tt,1LA0S
Mt1?a ON,
zi
1
0a
8
00t[
obZr
oirtz
ry
8
3. PI, 1 ZOOS
ti
80
•
a
N
l
1
80
1
80
80
06'f6Z£'I
3 .1.1,29 10 1
Tia
1
co
LU
3
a
2 '1
5
1— — —
11,MON 311N3AV
1" 11210
8
e
L_
7vamoxvo
— - 1- -
1
z
h
x -"'ro RY — .t 3' °+d T=Nd--- I.,.O
•
E
g
ijfl
10 1 hi' .,,
, , 1
a 1p,1 g ig
II ,,,,,, : '11:1 : '
+ 1 I I i 11
2
D IF
,..1,.
cs i ad 1 1
ob it
a
Et 13 F .g. 1 11 lb
'9. Z i 01 •
. i Y ] . i Pli
I
.-D ° ii
ii 1 1
8 V e. 1 ,i 8
'h `j 1 E' i ill
1 1,
E ' ..
1 1 §"
1 1 i 1 1 I
1 1 1 id 1
11 ' 1p il 1 gl . ill il iS
• Agi 11
gil mg .11 g at 1 11
211
71
Dg
1
g.11
w
H06Od 'ONOO
N2H01171
1.40021 SNIAI1
WDO�1Q34� ?��lSb'W
HO21Qd NO$'v'3S Tr '1.10
W1C]91 01d
HONOd NOOV'ge TT •ld0
WoCiN
xJNIN1C7
mural
140060.i9
Hr+21Od 'ONOO
lets _ _ sr I
;305❑ ZI.Z1
��t'r21b`�J
WOONCaG N2.1. vp'w
H0Z30d NOVv'a9 tr •1dO
wOON vNivli
1
1.1
Lii
Lii
z
0
s
FoIz, Freeman, Erickson, Inc.
W
LAND PLANNING e SURVEYING • ENGINEERING
PINE GROVE GARDENS
Narrative
February 9, 2005
The current Ackerman property, approximately 4.4 acres, is located east of Oakgreen
Avenue and north of 58 Street, and abuts City Hall. The existing parcel is currently
zoned Open Space.
The request for this project is for R3 Multiple Family Residential District zoning, with
a total of 26 units in five townhome buildings. We intend to process the request as a
PUD to allow for flexibility in the strict provisions of the ordinance. The guidelines
for setbacks and lot size of R3 Zoning are met with the exception of the front yard
setback. We are requesting a reduction of the 30 foot required front yard setback to a
20 foot setback from the street. This setback reduction will allow the project to pull
the buildings away from the existing trees in the rear that we are trying to preserve.
The code allows for 4000 square feet per unit for determining overall density. This
should net 34 units for the project. This proposal only requests 26 units. The reason
for the reduced density is accommodate for the area needed to allow the 1995 layout
of the Hwy. 36 design to be preserved.
The proposed units will be serviced with city sewer and water, with connections being
made to existing facilities north and west of the proposed project.
The private street as proposed is 24 -feet in width, which will not allow for parking.
The units will have attached garages with driveways that provide for off street
parking. Several small visitor parking lots are provided. The open areas between the
driveways have been designed to incorporate extensive landscaping gardens and for
the use of snow storage. The project provides for extensive landscaping and re-
vegetation to help mitigate the loss of existing trees. A 8 -foot wide trail is proposed
which would connect the east end of the proposed project to the existing trail to the
north.
The project is located in the Middle St. Croix Watershed and will require their review.
The proposed drainage and ponding as shown on the plan provides the storage to
reduce the runoff from the site to below that of the existing conditions. The site
drainage incorporates the existing wetland found in the northeast corner of the site,
helping to keep this a viable wetland, also reducing the impacts to the surrounding
area.
A tree count has been completed as shown on the Existing Conditions Map, Figure A.
EXHIBIT 13
5620 Memorial Avenue North, Stillwater, MN 55082 4 Phone: (651) 439 -8833 ♦ Fax: (651) 430 -9331 • Website: www.ffe- znc.com
Bruce A. Folz, LS Timothy J. Freeman, LS Todd A. Erickson, PE
1939 - 2001 President Vice President