HomeMy WebLinkAbout2002-10-22 PWD Email Re Erosion Control IssuesKris Danielson From: Jay Johnson Djohnson a@cityofoakparkheights.corn] Sent Tuesday, October 22, 2002 5:06 PM To. 'Dennis Postler'; 'Kim Kamper'; 'Kris Danielson'; 'Judy Hoist'; 'Jim Butler'; 'Mark J. Vierling'; 'Mitch Johnson' Subject: Goldridge Group and oak park Station Pond Erosion Control Issues Earlier today I met with Steve of Goldridge Group and Mitch Johnson Representing Browns creek Watershed District in reference to the erosion control problems at the Kern center pond. The ditch leading from the new section of the pond to the west has eroded badly. The ditch is undercutting itself and the undercut is moving west. This undercutting was happening before oak Park Station was developed and we had hopped that the pond expansion and the widening of the ditch as a part of the pond development would have stopped the undercutting. This did not work. Only a portion of the water causing the problem in this area is from oak Park Station. Goldridge is going to address the erosion control issues that are totally their responsibility such as downed silt fences and dirt in the pond that is from oak Park Station only. They are going to put together cost estimates to address the ditch undercutting issues and removal of sediment from the pond from the undercutting. Goldridge group did not maintain their erosion control fences in the ditch that would have minimized the sediment from entering the pond. The two solutions discussed on site were to install a series of rock cutoff dams along the ditch With the first one at the current undercut site and then several more to the east and the install a rock spillway the length of the ditch starting at the point of the current undercutting. The next issue is to determine the contribution of oak Park Station to the ditch undercutting and determine a method of financing the repair. Jay