Loading...
HomeMy WebLinkAbout2001-11-01 BRAA Ltr to OPHBonestroo 0 Rosene Anderlilc & Associates En & Architects November 1, ?001 Bonestroo, Rosene, Anderlik and Associates, Inc. is a! ative Action Opportunit Emplo and Emplo Owned Principals: Otto G. Bonestroo, RE. ■ Marvin L. Sorvala, RE. ■ Glenn R. Cook, PE. ■ Robert G. Schunicn RE. ■ Jerr A. Bourdon, RE. Senior Consultants: Robert W. Rosene, P.E. - Joseph C. Anderlik, RE. Richard E. Turner, RE. ■ Susan M. Eberlin, C.P.A. Associate Principals: Keith A. Gordon, RE. ■ Robert R. Pfefferle, RE. Richard W. Foster, PE. - David 0- Lo-skota, RE. Mark A. Hanson, RE. - Michael T. Rautmann, PE. ■ Ted K. Field, PE. ■ Kenneth P Anderson, RE. ■ Mark R. Rolfs, RE. David A. Bonestroo, M.B.A. , Sidne P Williamson, PE., L.S. - A M. Rin M.B.A. ■ Allan Rick Schmidt, RE. ■ Thomas W Peterson, PE. - James R. Mafand, RE. - Miles B. Jensen, RE. - L. Phillip Gravel III, P.E. a Daniel J. Ed PE. • Ismael Martinez, RE. - Thomas A. S PE. - Sheldon J. Johnson ■ Dale A. Grove, RE. - Thomas A. Roushar, RE. ■ Robert J. Dever RE- Offices: St. Paul, St. Cloud, Rochester and Willmar, MN - Milwaukee, Website: www.bonestroo.com Ms. Kris Danielson Communit Development Director Cit of Oak Park Hei 14168 Oak Park Blvd., P. 0. Box 2.007 O ak Park H e I t aj-1 1%,- s 9 %Lf N 550 82 -_'007 Re: S & C Bank ( Oak Park Station Lot 1, Block 2 Revised Concept Development Plan Review Bonestroo File No. 5.5. -01 -000 Dear Kris: We have reviewed the revised preliminary site pan, an T n-jdin,. I I a-, & drz-dna and utilit plans fbr the proposed S3 & C Bank development (Oak Park Station Lot 1, Btocl&- 2 in tic Kern Center as submitted b METRO Land Surve ina Enpairieerlflo Z� a. li 4 d have the followl-nc, co moments /recommendations : Site Lavout/Access Locations: 1. The northerl dn`%rewa has been moved ap I . prox;matel '0' farther south than previousl shown now 80' from 5 8th Street North). W,.,-a, still recommend th(-.-3- northerl dnv,.,a.,A1fa be a minimum of 150' from 5 SLh Street North, however 80' will allo�.v approximatel 4 cars to q ueue northbound on the private street without blockina, the drivewa While v,Te don't foresee an safet issues with the la as proposed, the Cit ( and Barak) should realize the • fo I I 1. lowl." When traffic volumes increase on this private street as development 'Mcreases, this drivewa entrance ma be blocked with traffic tr to access 58't' Street North durin cars tr to enter the bwik- parkin area ma end u us in g the peak times. As such, Z� P usin., bank's drive-thru entrance to the south, and cars tr to exit the northerl drivewa ma experience some dela We recommend that "Do Not Block Intersection" sima and stripin be installed on the private street at the norther drivewa location. Z) W If the la parcel across from the bank will access the private street when it develops, the drivewa location(s) will need to be reviewed at that time and should be a min -i mum. distance of 150' from 5 8!h Street North. The internal traffic flow is intended for the south:erl drivewa to be an "in Onl for drive- thru customers and for the northerl drivewa to allow both in and out traffic to the parkin Z70 area. Internal si should be installed ( at the southeast corner of the buildin and j ust west of the bank sip? to prevent customers from exitin via the southerl drivewa .0 The southerl drivewa entrance has been narrowed to 2Y and is acceptable as shown. 2335 West Hi 36 a St. Paul, MN 55113 le 651-636-4600 a Fax: 651-636-1311 Gradin 4. The westerl portion (approximatel one third) of the site is proposed to drain to the private street to the west (then southerl down the private street). The developer has indicated the private street will most likel be constructed onl in front of the bank at this time. As such, measures need to be taken to ensure storm water runoff can occur to the south and erosion control measures also be in place until the street is extended. 5. The easterl two thirds of the site are proposed to drain to the west to the existin State Hi 5 ditch. The proposed g rades indicate storm water runoff will concentrate at the northeasterl comer of the parkin lot. We recommend that a catch basin be located at this comer of the parkin lot with a flared end outlet to the existin S.H. 5 ditch, with ade riprap placed at the outlet. MnDOT will need to be contacted re storm water outlets in this area since the existin ditch is in their ri Sanitar Sewer & Water Main: 6. Sanitar sewer and water services are proposed to tie into main lines proposed in the private street as part of Oak Park Station. These main lines will need to be in place prior to, or concurrentl with, the bank development. If the utilities are to be phased for Oak Park Station (coinin from the north), we recommend the sanitar sewer be installed up to and includin the proposed manhole south of the bank service and the water main be installed up to and includin the proposed h south of the bank service. If y ou have an q uestions re this review, please contact me at (651) 604-4815. Sincerel BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC Dennis M. Postler, P.E. cc: Kim Kamper, Actin Cit Administrator Ja Johnson, Public Works Director Jim Butler, Buildin Official Scott Richards, Cit Planner (Northwest Associated Consultants, Inc.) Mark Vierlin Cit Attorne (Eckber Lammers, Bri Wolff & Vierlin P.L.L.P.) DMP, DDH, File — Bonestroo K:155\Oid\S & C Bank (Oak Park Station) -Rev. Concept Derr. Plans-11-1-01.doe