Loading...
HomeMy WebLinkAbout2002-03-07 BRAA Email to OPH Re Metro Land Surveying Proposed Construction ScheduleKris Danielson From: Postler, Dennis M [dpostler c. bonestroo.com] Seat: Thursday, March 07, 2002 9:42 AM To; Jim Butler (E -mail) Cc: Kimberly Kamper (E- mail); Mark Vierling (E- mail); Jay Johnson (E-mail); Kris Danielson (E- mail); Judy Holst (E- mail); Scott Richards (E -mail) Subject: FW: oak Park Station construction schedule MEMO- schedule3-6. doc Jim: Attached is a proposed construction schedule from METRO for oak Park Station (Phase 1). If the have all their business up -to -date with the City (Plat signed, Dev. Agrnt. signed, Letter of Credit deposited), I don't have a problem with issuing them a grading permit. In fact, we need them to do the site grading prior to our contractor beginning the public improvements. As far as issuing a building permit, 1 don't have any major issues with that either. The only point of conflict will be when our contractor is to construct the bituminous pathway along the south side of 58th Street North and they are still using the existing driveway as their construction entrance. We will need to coordinate this issue with our contractor and their builder. (I don't foresee any additional cost issues, because if there are any, the developer is paying for the costs of all the public improvements anyway.......). Give me a call to discuss or if you have any questions or concerns. Thanks. Dennis Postler ----- Original Message----- - From: John C Johnson [mailto:jcjohnson a@metrols.com] Sent: Wednesday, March 06, 2002 5:14 PM To: dpostler@bonestroo.com Cc: Brad Coats (E -mail) Subject: oak Park Station construction schedule Dennis, Attached is the schedule as we talked about March 5, 2002. Please let me know if it is okay. I will fax a hard copy. John C Johnson Director of Engineering Ph: (661) 766-0112 E -mail: jcjohnson@metrols.com