Loading...
HomeMy WebLinkAbout2001-10-02 NAC Planning ReportBACKGROUND ItTINWIST ASSOCIATIM CONSULTANTS. INC Attached for reference: 5775 Wayzata Boulevard, Suite 555, St. Louis Park, MN 55416 Telephone: 952.595.9636 Facsimile: 952.595.9837 planners@nacplanning.com PLANNING REPORT TO: Kimberly Kamper FROM: Bob Kirmis/Scott Richards DATE: October 2, 2001 RE: Oak Park Heights — Oak Park Station Preliminary PIat/PUD and s and C Bank PUD/CUP FILE NO: 798.02-01.11 Goldridge Group has requested preliminary plat approval of an eight lot commercial subdivision entitled "Oak Park Station" located south of 58 Street between Highway 5 and Memorial Avenue North. Because the proposed subdivision incorporates a private service drive, the processing of a planned unit development (Concept Plan) in conjunction with the preliminary plat is necessary. In addition to the request for subdivision approval, the applicants have also requested approval of a planned unit development/conditional use permit (General Plan) to allow the construction of a 5,988 square foot bank (with a drive-through facility) upon proposed Lot 1, Block 2 of the subdivision. The subject property is zoned B-3, Highway Business and Warehouse Exhibit A - Site Location Exhibit B - Preliminary Plat Exhibit C Grading and Drainage Plan (subdivision) Exhibit D — Utility Plan Exhibit E - Site Plan Exhibit F Grading and Drainage Plan (bank) Exhibit G - Floor Plan Exhibit H - Building Elevations Exhibit 1- Landscape Plan Exhibit J - Lighting Plan Exhibit K - City Arborist Comments ISSUES ANALYSIS Preliminary Plat Lots. As shown on the preliminary plat, a total of eight Tots have been proposed ranging from 0.8 to 2.5 acres in size. All proposed Tots have been found to comply with the minimum 15,000 square foot area requirement of the B -3 zoning district. While all proposed lots meet the minimum 100 foot width requirement of the B -3 district, some concern exists in regard to lot width consistency. Although Lot 4, Block 2 technically meets the minimum 100 foot width requirement, it is provided significantly Tess width than other Tots within the subdivision. To address this concern, it is suggested that the shared side lot line between Lots 3 and 4, Block 2 be shifted northward (and emanate from the centum of the adjacent private street arc). It should be noted that Lots 1 and 2, Block 1 and Lot 5, Block 2 are provided double frontage and are oversized. In this regard future resubdivision possibilities for such Tots exist. Outlets. The preliminary plat includes two outlots; one overlaying the proposed private service drive and the other overlaying a designated drainage area. Both outlots are however designated as "outlot A ". This should be corrected as a condition of preliminary plat approval. In regard to the proposed designation of the private street and drainage area as outlots, the City Attorney has recommended that either the applicant provide information (satisfactory to the City Attorney) justifying the outlot designations or the private drive and drainage area be constructed within an established easement Easements. Presently, Lot 2, Block 1 and Lots 4 and 5, Block 2 are bisected by drainage and utility easements. To provide ample area for buildings upon such lots, these easements will need to be vacated. This issue should be subject to further comment by the City Engineer. To be noted is that a 30 foot wide drainage easement has been provided between Lots 4 and 5, Block 2. The acceptability of this and other easements should be subject to comment and recommendation by the City Engineer. Access. As illustrated on the preliminary plat, all proposed Tots are provided double frontage. While Tots abutting Highway 5 w i l l be provided access via the proposed 2 private street, future lot access to other Tots is undetermined at this time. To optimize access opportunities (and provide greater lot size consistency), it is conceivable that Lots 1 and 2, Block 1 and Lot 5, Block 2 could be resubdivided at some future point. If future access is to be provided along Memorial Avenue North and 58 Street, access locations should, to the extent possible, be in alignment with existing curb cuts which border the subject property. Access issues associated with the bank proposal will be discussed later in this report. Streets. As previously indicated, a private service drive has been proposed as part of the subdivision. Such service drive is to be constructed within a 40 foot wide outlot. To accommodate the proposed private service drive (and lots without public street access), the processing of a planned unit development (concept plan) is necessary. As a private drive, maintenance responsibilities will Ile with the developer (or his assigns) and will likely be governed by an association. As a condition of final plat approval, documents ensuring the maintenance of the private drive should be submitted to the City Attorney for review and approval. Appropriately the northerly access to the subdivision is in alignment with an existing curb cut along 58 Street North. It is the applicant's intent to construct the service drive in a sequence which follows site development. While this is considered an acceptable situation, a temporary cul -de -sac should be provided at the service drive's southern terminus. Grading and Drainage. As noted previously, a portion of the site (Outlot A) has been dedicated for the purpose of stormwater storage. The acceptability of the proposed stormwater holding area and other grading and drainage issues should be subject to review and comment by the City Engineer and the applicable watershed district or authority. Utilities. The City Engineer should provide comment and recommendation in regard to utility issues including light standards of the proposed private service drive. Park Dedication. Park dedication fees for the subject property were previously paid to the Township. As a result, no park land or cash contributions will be required. Development Agreement. As a condition of final plat approval, a development agreement between the applicant and the City w i l l be required as part of the approvals subject to City Attorney and City Council review and approval. All aspects of the agreement including the payment of assessments related to standard utility construction shall be additional conditions of approval for the proposed development. As a condition of Final Plat approval, connection fees (for water, sewer and sanitary sewer) for all lots which comprise the proposed subdivision will need to be paid. 3 Use Ordinance Requirement Required Spaces Bank 5,988 s.f. x .9 = 5,389 s.f. 1 space per 250 square feet of floor area 22 Bank (drive -up component) Four drive -in units 2 spaces for each drive -in aisle plus 180 feet of stacking space for each drive -in unit 8 Required Spaces 30 Planned Unit Development /Conditional Use Permit Development Proposal. As previously indicated, the applicant is proposing to construct a 5,988 square foot bank (with a drive- through facility) upon proposed Lot 1, Block 2 of the subdivision. To accommodate a development without public street access and the bank's accessory drive -up facility (a conditional use in the B-3 district), the processing of a PUD/CUP is necessary. Off-street Parking. As shown below the ordinance requires a total of 30 off - street parking spaces for the proposed bank. In excess of the above requirement, the applicant is proposing to provide 59 off - street parking spaces. It should be noted that the City encourages "proof of parking" in cases where the off - street parking supply exceeds expectant demand. Considering that the applicant is proposing to exceed the required parking supply by 29 stalls, reserving land as "proof of parking" should be considered. All off - street parking stalls and drives aisles have been found to comply with minimal dimensional requirements of the ordinance. Site Access. As shown on the submitted site plan, the subject site is to be accessed via two points from the private service drive. While the two access points themselves are considered acceptable, some concern exists in regard to the proximity of the northernmost access to the 58 Street North /service drive intersection. With a separation of only 26 feet, minimal stacking space will exist at the intersection. To address this concern, it is suggested that the site's northernmost access be shifted southward approximately 20 feet. Another item of concern is the southernmost curb cut. At 50 feet in width, the curb cut significantly exceeds the maximum 24 foot width standard required by the Ordinance. While a curb cut width in excess of 24 feet can be accommodated via the planned development and is likely desired in consideration of the need to access the proposed drive -up lanes, it is suggested the curb cut width be reduced to 32 feet. Access related issues should be subject to further comment by the City Engineer. 4 Site Circulation. While the site circulation system appears relatively straight forward, some concerns do exist. In consideration of the drive -up tellers and their location, the site seems to lend itself to a one -way circulation pattern. It is believed that two -way vehicle circulation; particularly south of the teller lanes would be highly problematic. At times when the southernmost drive -up lane is used, only a 10 foot wide drive aisle will exist between the vehicle using the teller (or ATM) and the adjacent off - street parking stall. To address this concern, the following site modifications are suggested: O A one—way circulation pattern be utilized such that entry to the site occur at the southernmost access and exiting occur to the north. • Off-street parking stalls to the south of the southernmost drive -up teller lane be eliminated and converted to green area. • The southernmost row of parking stalls be converted from a 90 degree to 60 degree configuration. Setbacks. While the nature of planned development allows for interior setback flexibility, perimeter setback requirements of the applicable B -3 zoning district must be upheld. Within B -3 zoning districts, a 40 foot front yard setback is required. With a setback of 55 feet from Highway 5 and 77 feet from 58 Street North, perimeter setback requirements have been satisfied. As shown on the submitted site plan, the bank is proposed to lie 21 feet from the curb of the proposed private service drive. As a condition of P U D /CUP approval, such setback should be increased to 25 feet. Building Height. The B -3 zoning district establishes a maximum building height of 35 feet. At approximately 17 feet in height, the bank satisfies this requirement. Building Materials. The zoning Ordinance states that building materials of structures within B -3 zoning districts must adhere to both the requirements of the ordinance and the City's design guidelines. The design guidelines state that buildings should be designed specifically for the site and should relate to surrounding buildings in terms of style, color and materials. The guidelines further state that commercial buildings must be composed of at least 65 percent Grade 1 or Grade 11 materials. The bank is proposed to be finished in a combination of materials. The base of the building is to be finished in split face concrete (color not specified). The mid section of the building (above the base) and building entrances are to be finished in face brick while upper third of the building (and drive - through canopy) are to be finished in E1FS. 5 While the building satisfies the material requirements of the Ordinance and design guidelines, specific building material colors should be specified. Drive -up Lanes. As shown on the site plan, four drive -up lanes have been proposed on the south side of the bank. According to the ordinance, each drive -up lane must provide 180 feet of stacking space (the equivalent of 9 cars). In contrast to the ordinance requirement, only 80 feet of stacking space for each drive -up lane have been proposed. While the bank technically does not satisfy the ordinance requirement of 180 feet per lane, the total amount of vehicular stacking space (320 square feet) satisfies the intent of the stacking requirement as originally conceived. Thus, the proposed dispersal of the stacking space is considered acceptable and may be accommodated via the P U D Landscaping. The submitted landscape plan has been subject to detailed review and comment by the City Arborist (see attached Exhibit K). Comments include, but are not limited to, the following recommendations: • The plan should list the scientific names of all plantings. • The plan should be revised to provide more attractive and consistent plant materials. • The plan should be prepared by a professional landscape designer or a landscape architect. Sidewalks. As a condition of PUD /CUP approval, the site plan should be revised to illustrate (and the applicant should be responsible for the construction of) an eight foot wide sidewalk along the proposed service drive. In addition, a connection from such sidewalk to the bank should be provided. Lighting. As required by Ordinance, a lighting plan has been submitted for review. According to section 401.15.B.7 of the Ordinance, no light source which cast light on a public street may exceed one footcandle reading as measured from the centerline of the street. Further, no light source which casts light on adjacent property may exceed four - tenths footcandles at the property line. While it is acknowledged that the subject site is to be served by a "private" service drive, the lighting standards of the Ordinance for a public street will be imposed. All site lighting should be hooded and directed such that the source of the light is not visible from surrounding properties and rights -of -way. As an additional condition of approval, details regarding fixture type and location should be provided. 8 Grading and Drainage. As required by ordinance, a grading and drainage plan specific to the subject site has been submitted. Grading and drainage issues shall be subject to review and comment by the City Engineer. Utilities. Utility related issues shall be subject to review and comment by the City Engineer. Signage. As shown on the site plan, freestanding signs have been proposed in the northeast and southeast corners of the bank site. The sign in the northeast corner is specific to the bank and measures six feet in height and 18 square feet in area (per City definition of sign area) while the sign in the southeast corner is an area identification sign. The area identification sign measures 10 feet in height and 70 square feet. While both freestanding signs are considered acceptable in terms of size and placement, the area identification sign should lie within an easement to allow for maintenance by a party or parties other than the property owner. Wall signs have been proposed on the north and west sides or the building. According to the ordinance, buildings with B -3 zoning districts are allowed a maximum of 64 square feet of wall signage. While specific wall sign dimensions have not been provided, it appears this requirement has been satisfied. Details related to proposed wall signage should be submitted as a condition of PUD /CUP approval. As a condition of PUD /CUP approval, all applicable sign related requirements of the ordinance must be satisfied. Trash. A single trash enclosure has been proposed in the southwest area of the site. The enclosure measures 5 feet in height and matches the finish materials of the principal building. Development Agreement. A planned development agreement between the applicants and the City will be required as part of the approvals subject to City Attorney and City Council review and approval. RECOMMENDATION Based on the preceding review, our office recommends the following: A. Preliminary plat /planned unit development approval of a seven lot commercial subdivision entitled "Oak Park Station" subject site subject to the following conditions: 7 1. The shared side lot line between Lots 3 and 4, Block 2 be shifted northward (and emanate from the centum of the adjacent private street arc). 2. The preliminary plat is revised such that each outlot is provided its own separate description. 3. The existing easements bisecting Lot 2, Block 1 and Lots 4 and 5, Block 2 are vacated. This issue should be subject to further comment by the City Engineer. 4. Prior to final plat approval, documents ensuring the maintenance of the private service drive are submitted to the City Attorney for review and approval. 5. The City Engineer and the applicable watershed district or authority provide comment and recommendation in regard to drainage and utility issues. 8. A temporary cul-de -sac is provided at the service drive's southern terminus. 7. As a condition of final plat approval, the applicant enter into a development agreement with the City. 8. Either the applicant provide information (satisfactory to the City Attorney) justifying the outlot designations over the proposed private drive and drainage area or the private drive and drainage area be constructed within an established easement 9. As a condition of Final Plat approval, connection fees (for water, sewer and sanitary sewer) for all lots which comprise the proposed subdivision shall paid. B. Approval of a planned unit development /conditional use permit to allow a 5,988 square foot bank (with drive -up lane) upon Lot 1, Block 2, Oak Park Station subject to the following conditions: 1. The City approve the final subdivision of the Oak Park Station. 2. The northernmost access is shifted southward approximately 20 feet. This issue should be subject to further comment by the City Engineer. 3. A one—way circulation pattern be utilized such that entry to the site occur at the southernmost access and exiting occur to the north 4. Off-street parking stalls to the south of the southernmost drive -up teller lane be eliminated and converted to green area. 8 5. The setback of the building from the curb of the private service drive is increased to 25 feet. 6. The southernmost curb cut be reduced to 32 feet in width. 7. Consideration is given to establishing those parking stalls in excess of the minimum supply requirement of the Ordinance as "proof of parking" stalls. 8. The southernmost row of parking stalls be converted from a 90 degree to 60 degree configuration. 9. The City Engineer provide comment and recommendation regarding setbacks from the proposed private service drive. 10. Specific building material colors are specified and found to be acceptable by the c ity. 'l1 .An eight foot wide sidewalk is constructed by the applicant along the private service drive. A connection from such sidewalk to the bank shall also be provided. 12. Details regarding lighting fixture type and location are provided. 13. All site lighting is hooded and directed such that the source of the Tight is not visible from surrounding properties and rights -of -way. 14. The following conditions related to the landscape plan are satisfied: A. The plan shall list the scientific names of all plantings. B. The plan shall be revised to provide more attractive and consistent plant materials. C. The plan shall be prepared by a professional landscape designer or a landscape architect. D. The revised plan shall be subject to review and approval by the City Arborist. 15. The area identification sign is located within an easement to allow for maintenance by a party or parties other than the property owner. 16. Details related to proposed wall signage are submitted subject to City approval. 17.The City Engineer provide comment and recommendation in regard to grading and drainage issues. 18. The City Engineer provide comment and recommendation in regard to utility issues. 9 11111111111U 491 111111 1_,..,1111111111.111111011111011111 month now -.111111111111 4.. i 1901119111 91111191110 w oo" 7 " I SLIM. Ell t 111 I MUM:a ;111:115 * J 1 EI;10 "'TEMA opi. E • 11 a p 1 1 / 1 ainuriarq .0 ham 9101 111111 1.111111111 1111111 101111111111 11111111111111 " 01 111111111111 lialni" 9110 11 111166 1 0 1 19111 an MB MED MID 91111 1.119 1111111 11119 '11111 01111 tt% 11 -MUM 201IIII 01111 10111 111111 111111 111111 11110 19111 111111 111111911111111111 111111111111 11119111111 111111 111111111111 111111111111 11111111111 A1011119 1111119111 111111119111 91111111 10 011119 110 11 111E1 1 11 1111191119 11111 11110 911111111111 1111011911 MED 111111111_111 111191911 111111111111 111111111111 nil • 191 111111111111 111111111111 11111191111 1 11119111 11911111111 9111111111 _ 1111111111 19111111111 111111111111 9111111111 01111111111 91111011 11111 11 11111191111 111111111111 111111111111 01111111111 H z w + (I) 0 Z 0. 0 EXHIBIT 4 - SITE LOCATION 0 e • T . T I', F. . • 4.4 st*.q - ---- - ---------------------- ---- ----------------------- --- ---- ------- ptCS'Elt.. 20 00 "VT-a:C-4411'7 ---------- 932 554°53 635.33 .3..99,1S.TSS ,'" 7 wt.+, c - ---- - - , ----- 612.25 N5453 0 \ S „ . ih JA97,L f t • \\t': )1 - - --------- 3 z § rao arM3l,tri0 � • 13 V • _r n�E31V Zi \ e M N 1 � 'H18�q as S9's8_� L l>a'IfE�h c r 9 �+ 7 rr �Yrr� ^'- —� ' • .AaaC.idSSY�rr�f �.. .rte. e...r-In � . " =i��� `r ���'s III11j, \ 111 11 1 1 1 - I1131 {1 09 'LK 'A313 t1001J a Eand, ,c7), 14.0AOLLLULIIS 1-11g5 NIYM12.1.Vh dkJ aj 1111 CMS, 1 1 e 411111 tN\ .. ili 11.z, 4 J EL, gs 1. uj 0 11111111111111 411EMEN • Ni -, kvO it 7 r\ C) B 2 el "zi el - 10 • s ci? 5 3 1 7 4 taimamitsozattas 2 n gE x t.7 2�. 0 ~ a ti nr 5 W O 4 O Q } � 41 a� ®ru3e9 ■00 �`°... I z a c 0 1 z a I D A cc • m r F = x w " { yy ` y l-1 7 5 3 r T 3 Q c "} J O. 0 0 —J L- x w aIIluIuII Min J '�d ..D5 ►--� ! V I Cr 1 "A"-7/0 1 v- 2 11111Illl1l 1 1•f1 issi t!iiiiiiiin 1 ,.1: 11111111111111311 I. ' illl!4lii fogi141 b 11 . ' mil ..� I _ } I rf -lam E! 1 if iftli:llltfi�ilif +': �t 1111111111'1, j _ll, 1i um I�IlIW1l lei ;UIilll! SNOISIA3N 31,0 !t X Ifid!giti 190-91:11, (NO ,A1 Z110-991., (190 ..mid.i9J. • ~1 /Alga . .P.u.a .I11 11 Pli .o Alun.0 ONISMNIIMUI V INIMIAITOS CINV1 UM: mg.. 01113-01 T HMIS )11\IVEI S ........... ------- 1-11.1:10N 129E1S 1-11.8g ----- ------------ "ws 00S-L99 (0) stve-I_ z 'cti, toss; mil I1 x` • 'VI %MOW a000XF100 41.6.J a 5 2 6 1 466 05 rata,. os0 d Lu /' '-L NAC From: 'K.D. Widin" <kwidin mmmpcc.org> To: <srichards nacplanning.com> Sent: Thursday, September 27, 2001 3:54 PM Subject: S &C Bank - Landscape Plan Scott - I have reviewed the landscape plan for S &C Bank and have the following comments: 1. The Planting Schedule should include the scientific names of the plants. 2. The Planting Detail should also include: cutting the twine at the base of the trunk, cutting off the top of the burlap, or folding it down into the hole, cutting off the top two rungs of any wire basket encasing the root ball. 3. It is preferable erable to not stake trees. 4. Any added backfill or "planting" soil should constitute no more than 1/3 of the backfill soil put into the hole, and should be mixed with existing soil. 5. The landscape plan itself is not acceptable and should be re -done by a professional landscape designer or landscape architect. It is not acceptable for the following reasons: a. Some of the plant sizes drawn are not accurate and do not reflect the mature size of the plants. b. The plan uses a very strange mixture of plant material. Eastern red cedar and Siberian peashrub have some good attributes, but being an attractive landscape plant is not one of them. Redbud is not hardy in Minnesota and becomes a shrub if it lives at all. c. The plan as drawn is not attractive and is inconsistent. There should be a variety of plant material but some repetition of design around the perimeter of the lot would be more attractive. There is no "design" to the plan. It is just an assemblage of plants in lines. Grouping at least some of the plants will result in a more pleasing design. Kathy Widin Municipal Arborist Page 1. of EXHIBIT K - CITY ARBORIST COMMENTS 9/28/2001. City of Oak Park Heights Page 2 of 2 9/28/20001