Mr. Anthon Valvoulis
Secure Mini Stora
740 Linwood Avenue
St. Paul,, MN 55105-3322
Bonestroo, Rosene, Anderlik and Associates. Inc. is -'firmative A ctio Opportunit Emplo
Principals: Otto G. Bonestroo, P.E. • Joseph C. And,- . RE, • Marvin L. Sorvafa, RE. ■
Glenn R. Cook, P.E. • Robert G. Schunicht, RE. ■ Jerr A. Bourdon, PE, ■
Robert W. Rosene, PE-, Richard E. Turner, RE. and Susan M. Eberlin, C.RA., Senior Consultants
Associate Principals: Howard A. Sanford, P.E. ■ Keith A. Gordon, RE. ■ Robert R. Pfefferle, P.E. •
Richard W. Foster, RE. ■ David 0. Loskota, P.E. • Robert C. Russek, A.I.A. • Mark A. Hanson, P.E. •
Michael T. Rautmann, P.E. ■ Ted K.Field, P.E. • Kenneth P Anderson, RE. • Mark R- Rolf s, PE. -
Sidne R Williamson, RE., L.S. • Robert F Kotsmith -1 A M. Rin • Allan Rick Schmidt, RE.
Offices: St. Paul, Rochester, Willmar and St. Cloud, MN ■ Milwaukee, Wl
Webs1te: www.bonestroo.com
Re: Kern Center Connection Char
Cit of Oak Park Hei
Our File No. 55-98-802
Dear Mr. Vavoulis:
We are in receipt of y our letter of Jul 25, 1999 re information relative to the connection
char bein assi to y our Secure Mini Stora site in the Kern Center. The followin is in
response to y our q uestions I throu 7 as outlined in y our Ma 7, 1999 correspondence.
I . The followin table shows the breakdown of the $102,,714.00 connection char
Lot 8. Block 2. Kern Center 2nd
Trunk Sanitar Sewer 2.96 ac x $2,310.00/ac $6,837.60
Trunk Waterworks 2.96 ac x 4,010.001ac 11 ,869.60
Trunk Storm Sewer 2.96 ac x 5,080.001ac 159036.80
Total Lot 8 $339744.00
Lot 9, Block 2, Kern Center 2nd
Trunk Sanitar Sewer 3.00 ac x $2,3 1 0.00/ac $67930.00
Trunk Waterworks 3.00 ac x 4,010.001ac 129030.00
Trunk Storm Sewer 3.00 ac x 5,080.001ac 159240.00
Total Lot 9 $34
Lot 10. Block 2. Kern Center 2nd
Trunk Sanitar Sewer 3.05 ac x $2,310.001ac $77045-50
Trunk Waterworks 3.05 ac x 4,010.001ac 129230.50
Trunk Storm Sewer 3.05 ac x 51,080.001ac 15,1494.00
Total Lot 10 $347770-00
TOTAL SECURE MINI STORAGE
$102,3714.00
2335 West Hi 36 ■ St. Paul, MN 55113 ■ 651-636-4600 ■ Fax: 651-636-1311
Mr. Anthony Valvoulis
Secure Mini Storage
Page 2
2. The acreage charge rates were computed in previous comprehensive studies by
estimating the cost for the major trunk facilities to serve the entire City of Oak Park
Heights divided by the area to be served by these improvements. The facilities include
existing and future trunk and interceptor sanitary sewers, trunk water main and water
main oversizing, pressure reducing stations, sewage lift stations, force mains, wells,
pumps, pumphouses and water storage tanks and related appurtenances. These rates are
also increased from time to time to include inflation on future trunk type facilities.
3. The benefit of the trunk facilities in combination with the lateral utilities is to provide
water and sewer service for each property in the City of Oak Park Heights. The lateral
utilities must discharge to downstream facilities or be connected to supply facilities to
function. Therefore, both facilities and both charges must be considered for service. The
trunk and supply facilities are not required, theoretically, until connection is made which
is the reason for the two charges and the payment schedule for each. It should be noted
that the combination of connection charge and the estimated assessments for the Mini
Storage site results in a cost of just under 39 cents per square foot of land area which is
similar to or less than most other suburban costs for utility service to commercial land
uses.
4. we are not aware of an appeal process for connection charges if the charges simply
recover costs. You are always welcome to be placed on a Council Agenda with pertinent
information on most matters. Questions of this nature should probably be referred to
legal council rather than to the engineering staff.
5. City policy requires payment of connection charges in cash at the time building permits
are issued. At this point in time service is or will be available in the very near future.
6. City policy has no provisions for paying connection charges over time. You may
consider this a pertinent matter for discussion.
7. T he Secure Nlini Storage site is iucated one tau :c legasi y desei ibed lots so it is necessary
for the City to show assessments and connection charges for each legal lot. However, the
lots function as one site and the entire $102,714.00 must be paid at the time the building
permit is issued.
The final comment which should be noted is that all development occurring in the City of Oak
Park Heights pay the same area or connection charge, adjusted for inflation from time to time.
This includes Oak Park Ponds, Menards, the school, Autumn Ridge and all other development
including the Kern Center. These charges are being applied uniformly to recover costs being
incurred so it is believed that the charges are fair and equitable for the services provided.
Mr. Anthony Valvoulis
Secure Mini Storage
Page 3
It is hoped that the information provided herein will assist you in understanding the financing
procedures used by the City of oak Park Heights to provide public utility service.
Very truly yours,
BON ROSEN ANDER & ASSOCIAT INC.
a ao""
Joseph C. Anderlik
cc: Thomas Nlelena
Iris Danielson