Loading...
HomeMy WebLinkAbout2013-12-13 MSCWMO Letter Skiga.841 MIDDLE ST, CROIX WATERSHED MANAGEMENT ORGANIZATION 1380 WEST FRONTAGE ROAD , HIGHWAY 36 STILLWATER , MINNESTOA 55082 Phone 651 . 275 . 1136 x22 fax 651 . 275 . 1254 www mcwrrlo org MM.:* tas. MSCWOO December 13,2013 tasiela, Tam Eric A.Johnson,City Administrator 4er7 City of Oak Park Heights 14168 Oak Park Blvd.N. 4 . Oak Park Heights,MN 55082 , RE: Excel Energy Rail Yard Expansion Project-Oak Park Heights Dear Mr.Johnson, The Middle St. Croix Watershed Management Organization(MSCWMO)received required submittal items on December 8,2013 for the proposed Excel Energy King Plant Rail Expansion,located within MSCWMO boundaries and in the City of Oak Park Heights of member community. The proposed project qualifies for full review under the MSCWMO 2006 Watershed Management Plan(WMP). The project, as submitted, does not meet all Policies and Performance Standards contained within Section 5.0 of the MSCWMO WMP. The MSCWMO Board did not approve the project at their regular board meeting on December 12, 2013.The following conditions must be met before the project can be approved: 1. Direct discharge of stormwater to wetlands and all other water bodies without water quality treatment is prohibited. This project must meet the Design Standards for Structural Stormwater Management Measures of the State of Minnesota Stormwater Manual, November 2005, or the most recent edition. The Minnesota Stormwater Manual provides design standards for dry swales with check dams as a treatment approach for meeting applicable stormwater quality requirements. The watershed management organization also requests a skimmer device be installed to capture floatables prior to discharge. 2. The plan sheet must identify the stabilization of the last 200 lineal feet of a drainage swale or ditch must be completed within 24 hours. The enclosed checklists contain detailed information on project review qualification and the policies and performance standards of the WMP. MSCWMO review process information can be downloaded from www.mscwmo.org. Feel free to contact me at 651-275-1136 x22 or misensee®mnwcd.org if you have any questions regarding these comments. Sincerely, //ti A , / Mikael Isensee Administrator,Middle St.Croix Watershed Management Organization cc: Thomas Zellmer,Excel Energy, 1103 King Plant Road,Bayport,MN 55003 Mike Ryan,HDR Engineering,Inc.,701 Xenia Avenue South,Suite 600,Minneapolis,MN 55416 Enclosures Middle St. Croix Watershed Management Organization Member Communities Afton, Bayport, Baytown, Lakeland, Lakeland Shores, Lake St. Croix Beach, Oak Park Heights, St. Mary's Point,Stillwater,Et West Lakeland -111Alwatn\ MIDDLE ST. CROIX WATERSHED MANAGEMENT ORGANIZATION 1 380 WEST FRONTAGE ROAD , HIGHWAY 36 STILLWATER , MINNESTOA 55082 Phone 651 275 . 1136 x22 fax 651 . 275 . 1254 www tnscwtho org lgt: MSCW -, 11. MSCWMO PROJECT REVIEW PROCESS—POLICIES AND PERFORIWANCE STANDARDS :*** ing This document is for guidance. Applicants should consult the MSCWMO Watershed Management Plan(WMP)for specific requirements. All requirements of the policies and performance standards contained within Section 5 of the WMP must be met before the MSCWMO Board will approve the project. PROJECT NAME:XCEL ENERGY KING PLANT RAIL EXPANSION THE FOLLOWING POLICIES AND PERFORMANCE STANDARDS APPLY:[A checked bar indicates compliance] • Direct discharge of stormwater to wetlands and all other water bodies without water quality treatment is prohibited. WMP Section 5.1.4, Policy Item 1. lik.c, -4,,aaast ta',a ()ITYIV airr Manau, identifies dry swaka n nil check oains a;a moans fin PICA 12 ;I,IdtmerL :,o an app:tataaaaa ''':: Whi0(deo requests and a tD;:1171DICT doelce to preo,ent no diselua ap of raaaainaa,', anent apularable mormwater quality practices on the '; ,i'thea at ale f'" '' a prudeet OA Sources of water pollution shall be identified through the MSCWMO data collection program and corrected through the application of BMPs. WMP Section 5.1.4, Policy Item 2 2 All hydrologic studies shall analyze the 24-hour two- (2.75 inch),ten-(4.15 inch) and one hundred-year(5.9 inch)critical rainfall event,with the critical duration defined as that event causing either the highest water surface elevation or the largest peak discharge in an area or both.Any study must use consistent methodology for the pre-development and post- development land use conditions. The methodology must be approved by MSCWMO. WMP Section 5,1.4, Policy Item 3 Ej Newly developed or redeveloped areas will be limited to the predevelopment or existing rate of runoff or to a rate within the capacity of downstream conveyance systems, whichever is less, and no increase in the volume or rate of runoff from newly developed areas will occur in areas where natural outlets do not exist. In sub-areas of a landlocked watershed, development shall not increase the predevelopment volume or rate of discharge from the sub-area for the 10-year return period event. WMP Section 5.1.4, Policy Item 4. I-he Middle St. Croix WMO acknowledges site restrieJons that may result in only partial attainment or the retention requirernents 0 Runoff will be minimized through on-site infiltration or prevented through reduction in impervious surfaces to the largest extent possible before detention ponds are used. WMP Section 5.1.4, Policy Item 5. flee Middle St. 1,..`foix WMt) aeknevi ieliKe,,-, site restrictions that may result en only part tat attainment of the retention tequirement,, Middle St, Croix Watershed Management Organization Member Communities Afton, Bayport, Baytown, Lakeland, Lakeland Shores, Lake St. Croix Beach, Oak Park Heights, St. Mary's Pont, StHlwater, Et West Lakeland MIDDLE ST. CROIX WATERSHED MANAGEMENT ORGANIZATION 52\7-,,,, Site desill, practices that may have only a minor negative impact on peak flow and volume, such as the use of buffer strips along receiving waters and drainage swales, will be promoted to achieve compliance with the water quality performance standard. WMP Section 5.1.4, Policy Item 6 Applicants must secure any flowage easements that would be required to accommodate the stormwater management facilities. These easements will be i ted up to the 100-yr flood level. WAIF Section 5.1.4, Policy Item 7 4, Applicants will provide the MSCWMO with 100-year flood levels on the ponds,lakes, and streams as parcels are developed. WMP Section 5.1.4, Policy Item 8 'I The MSCWMO has adopted the Washington County Floodplain Regulations. (Appendix H). WMP Section 5.1.4, Policy Item 9 Retention is defined as the permanent or temporary storage of stormwater to prevent it from leaving the development site. WMP Section 5.1.4, Policy Item 10. The Middle Si. Croix WMO acknowledges site restrictions that may result in only partial attainment of the retention requirements 0 Detention is defined as the storage of stormwater in a pond or settling basin, where the rate of stormwater released is controlled. Detention time is the theoretical calculated time that a small amount of water is held in a settling basin. WMP Section 5.1.4, Policy Item 11. The Middle St, Croix WMO acknowledges site restrictions that may result,in only attainment of the detention requitements. • Project must meet the Design Standards for Structural Stormwater Management Measures of the State of Minnesota Stormwater Manual, November 2005,or the most recent edition at www.pca.state.mn.us/water/stormwater/stormwater-manual.html. WMP Section 5.1.4, Performance Standard 1; WMP Section 5.2.4, Performance Standard 1. Stoimwator design (3tandan).$ qoai;i .swalc'S That pr,p,:et; qu3111). practv,,, L 0..1 otiTo arcos thls projet* 0 Enhanced volume runoff controls will be desii ed to retain on-site the first 'A inch of runoff for all impervious areas plus 'A inch of runoff for areas with compacted soils. WMP Section 5.1.4, Performance Standard 2 a. Impervious areas or surfaces are defined as a surface in the landscape that impedes the infiltration of rainfall and results in an increased volume of surface runoff. b. Compacted soils are defined as surfaces in the landscape where the underlying soils are compacted by construction or other activity that impedes the infiltration of rainfall and results in an increased volume of surface runoff. c. In redevelopment scenarios, volume control standards apply only to areas of new construction,where soils are compacted,nmoff characteristics are changed, or vegetation is removed. Middle St. Croix Watershed Management Organization Member Communities Afton, Bayport, Baytown, Lakeland, Lakeland Shores, Lake St. Croix Beach, Oak Park Heights, St. Mary's Palm, Sthtwater, Et West Lakeland MIDDLE ST . CROIX WATERSHED MANAGEMENT ORGANIZATION The Middle St. Croix WMO acknowledges site restrictions that may inhibit attainment of the full retention requirement. O No increase in rate of runoff leaving the site from pre-development to post- development conditions generated by the 24-hour two- (2.75 inch),ten-(4.15 inch)and one hundred-year(5.9 inch)critical rainfall events. WMP Section 5.1.4, Performance Standard 3; WMP Section 5.2.4 Performance Standard 2. WMO acknowledges site restrictions that may result in only partial attainment of the retention requirements. III A Stormwater Pollution Prevention Plan(SWPPP)that meets the National Pollutant Discharge Elimination System (NPDES)requirements must be submitted to and approved by the MSCWMO for all projects undertaking grading,filling,or other land alteration activities which involve movement of earth or removal of vegetation on greater than 10,000 square feet of land (See Appendix J for NPDES requirements). WMP Section 5.1.4, Performance Standard 4; WMP Section 5.2.4, Performance Standard 3 SWPPP Requirements: 1,0 Description of the nature of the construction activity Address the potential for discharge of sediment and/or other potential pollutants from the site C: Identify a person knowledgeable and experienced in the application of erosion prevention and sediment control BMPs who will oversee the implementation of the SWPPP and the installation, inspection and maintenance of the erosion prevention and sediment control BMPs before and during construction Identify who will have the responsibility for long-term operation and maintenance of the permanent stormwater m :gement system 0.4, Identify a chain of responsibility with all operators on the site to ensure that the SWPPP will be implemented and stay in effect until the construct on project is complete,the entire site has undergone final stabilization, and a Notice of Termination has been submitted to MPCA r Narrative describing the timing for installation of all erosion prevention and sediment control BMPs C., Location and type of all temporary and permanent erosion prevention and sediment control BMPS along with procedures to be used to establish temporary BMPs as necessary for the site conditions during construction Ai Standard plates and/or specifications for all BMPs used on the project Site map with existing and final grades,including dividing lines and direction of flow for all pre and post-construction stormwater runoff drainage areas located within the project limits ED Site map including impervious surface areas and soil types; area of each must be noted(in square feet or acres) Location of areas not to be disturbed Middle St . Croix Watershed Management Organization Member Communities Afton, Bayport, Baytown, laketarid, Lakeland Shores, take St. Croix Beach, Oak Park Heights, St. Mary's Point, Stillwater, Et West Oketancl Location of areas where construction will be phased to minimize duration of exposed soil areas ;friar, n-i‘,st-/den 20v !nil& or drainage 6wejc -xr b,+!‘, 17111S C(A1,, t0( W6; Identify all surface water and wetlands wi '/ mile of the project that will receive stonnwater runoff from the construction site ■11 Methods to be used for final stabilization of all exposed soil areas Describe procedures to routinely inspect the construction site(once every 7 days and within 24 hours after a rainfall event greater than %inch) Describe practices to properly manage and dispose of solid waste Describe practices to properly manage hazardous materials 14 Describe practices for external washing of trucks and other construction vehicles (concrete trucks,etc.) r„1 Describe spillprevention plan Describe measures to address sanitary and septic waste 111 Direct discharge of stonnwater to wetlands and all other water bodies without water quality treatment is prohibited. WMP Section 5.1.4, Performance Standard 5 Predevelopment conditions shall assume"good hydrologic conditions"for appropriate land covers as identified in TR-55 or an equivalent methodology. The meanings of"hydrologic soil group"and"runoff curve number"are as determined in TR-55. However, when predevelopment land cover is cropland, rather than using TR-55 values for cropland, the following runoff curve numbers(RCN)shall be used. These curve numbers represent midrange values for soils under a good hydrologic condition where conservation practices are used and are selected to be protective of the resource waters. ' P Section 5.1.4, Performance Standard 6 Hydrologic Soil Group Runoff Curve Number A 56 B 70 C 79 D 83 r Conversion of high-penntability soils shall be avoided and these soils shall be targeted for infiltration. WMP Section 5.1.4, Performance Standard 7 Lowest floor elevations of structures built adjacent to stormwater management features and other water bodies must be a minimum of two feet above the 100-year flood elevation and a minimum of two feet above the natural overflow of landlocked basins. The landowner or developer is required to provide MSCWMO with the location of the 100-year flood elevation, natural overflow elevation,and lowest floor elevations. WMP Section 5.1.4, Performance Standard 8 Buffer zones of=mowed natural vegetation shall be maintained or created upslope of delineated wetland edges,ordinary high water elevation,or floodplain of all water bodies Middle St. Croix Watershed Management Organization Member Communities At ton, Bayport, Baytown, Lakeland, Lakeland Shores, Lake St. Croix Beach, Oak Park Heights, St. Mary's Point, Stillwater, a West Lakeland IrlholoTESKINialtd: aitlitritsfo ,„ , (wetlands,streams, lakes)in accordance with the Performance Standards relating to wetlands, Section 5.3.4. WMP Section 5.1.4, Performance Standard 9 Detention facilities will be designed to attenuate peak flows and provide on-site infiltration in high-permeability soils,natural depressions, and swales. WMP Section 5.1.4, Performance Standard 10 WMO acknowledges site restrictions that may result in only partial attainment of the detention requirements. 2 The MSCWMO shall require proper erosion and sediment control throughout the watershed to prevent siltation and sedimentation of streams,lakes,wetlands, and other areas of the watershed. WAIF Section 5.2.4 Policy item 1 2 Both temporary(during construction)and permanent(long-term)erosion control will be required on newly developed or redeveloped land in MSCWMO undertaking grading, filling, or other land alteration activities which involve movement of over 100 cubic yards of earth or removal of vegetation on greater than 10,000 square feet of land. WMP Section 5.2.4 Policy Item 2 Existing agricultural activities will be exempt from the performance standards listed in WMP Section 5.2.4. MSCWMO will require buffers from waterbodies and support agricultural BMPs.New agricultural activities must conform to the performance standards listed in WMP Section 5.2.4. WMP Section 5.2.4 Policy Item 3 Construction is prohibited on slopes greater than 12 percent. Twelve percent(12%)slopes are defined as lands having average slopes 12%or greater over horizontal distances of fifty feet(50)or more. WMP Section 5.2.4 Performance Standard 4 Construction is prohibited within 40 feet of the top of blufflines in urban areas and 100 feet in rural areas. Blufflines are defined as a line along the top of a slope connecting points at which the slope,proceeding away from the waterbody or adjoining watershed channel, becomes less than twelve percent(12%).The location of the bluffline shall be certified by a registered land surveyor or the Zoning Administrator. WMP Section 5.2.4, Performance Standard 5 0 Land alteration activities are prohibited within twenty(20) feet of the top of the bluff. Top of bluff is defined as the highest point of a bluff with an average slope exceeding 12%. WMP Section 5.2.4, Performance Standard 6 Buffer zones of unmowed natural vegetation shall be maintained or created upslope of delineated wetland edges,ordinary high water elevation,or floodplain of all water bodies (wetlands, streams, lakes)in accordance with the Performance Standards relating to wetlands, Section 5.3.4. WMP Section 5.2.4 Performance Standard 7 Middle St. Croix Watershed Management Organization Member Communities Afton, Baypnrt, Baytown, Lakeland, Lakeland Shores, Lake St. Croix Beath, Oak Park Heights, St. Mary's Point, Stillwater, & West I akeland