HomeMy WebLinkAbout2006-03-08 CR Window Signage CITY r
OAK PARK HEIGHTS
14168 Oak Park Boulevard No. • P.O.Box 2007• Oak Park Heights,MN 55082-2007• Phone:651/439-4439• Fax:651/439-0574
•
March 8, 2006
Jay Andrews,Manager
Fred's Tire Co.,Inc.
14520 60th St.N.
Oak Park Heights,MN 55082
Re: Window Signage Compliance Request—14520 60th St.N., Oak Park Heights,MN
Dear Mr. Andrews:
Please be advised that the window painting at the above-referenced business, appears to
be in violation of City Zoning Ordinance 401.15.G.6.(o.)wherein it states that temporary
window signs shall be permitted,provided that they do not exceed ten(10)percent of the
front building façade.
The window painting is considered temporary window signage per City Ordinance 401
and must comply with section 401.15.G.6. (o.), as described above. At this time you are
hereby requested to bring the window signage into compliance no later than March 27,
2006.
To determine ten(10)percent of your building front façade please note that this is
considered to be that portion of the exterior elevation, from grade to the top of the parapet
wall or eaves and the entire width of the building elevation. The front of your building is
considered to be the north side,which faces 60th St.
At such time compliance has been addressed, you are requested to submit compliance
documentation that provides:
1. How compliance has been met. If not complete removal, please provide
description of new placement and square footage of building front covered,
including the height and width covered area.
2. The square footage of your building front, including the height and width
measurements.
If you feel that the existing signage is compliant,please provide compliance
documentation as noted above. Documentation may be provided in person,via U.S.
Mail,Fax 651-439-0574 or via E-Mail @ jhultman@cityofoakparkheights.com.
Tree City U.S.A.
Additionally,please recall that local ordinance regulates banners and other temporary
special event or advertisement si
gnage; and that they are limited to 30 days per calendar
year and do require a permit from the City before they are installed.
Thank you for your prompt attention to this compliance request.Should you have any
questions please contact me.
Sincerely,
Juli A Hultman
Planning&Code Enforcement Officer
JAH:
c: Jim Butler,Building Official
Property File