HomeMy WebLinkAboutBP 1996-00452 Re-Roof 0 ..
GILDING 25.00
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
50
14168 57th Street North PLAN REVIEW PT= .STATE SURCHARGE
P.O.Box 2007
SIGN PERMIT
Oak Park Heights,MN 55082-2007 CITY UTILITY(METER)
(612)439-4439 UTLITY CONNECTION FEE
UTLITY INSPECTION FEE
PERMIT NO. BP-96-00452 Use Zone R-2 METRO S.A.C.
INVESTIGATION FEE
Permit Issued For REROOF PARKS CHARGE
OTHER
PERMISSION IS HEREBY GRANTED TOTAL 25 . 50
Owner ROSS BUSCHMAN Contractor WILLIAM R. HOWHTYA
5862 OLINDA AVE N 14858 97TH ST N
OAK PARK HEIGHTS MN 55082 STILLWATER, MN. , 55082
430-3245 439-0966
To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees
and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS I CLASS OF WORK
NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOUSH
5862 OLINDA AVE N X
FRONT or SIDE or LENGTH HEIGHT NO.OF AREA OF TYPE OF I MAX OCC.
WIDTH ( IN FEET I IN FEET STORIES LOT CONST. OCCUPANCY I LOAD . I VALUATION
FEET OCCUPIED
II V-N R-3 1
li PROPERTY DESCRIPTION: LOT BLOCK
AUTHORIZED WORK/SPECIAL CONDITIONS:
INSTALL PER MANUFACTURER'S SPECIFICATIONS AND MUST COMPLY WITH ALL MN STATE
BUILDING CODE REQUIREMENTS. PROPER ATTIC VENTILATION REQ'D. ICE SHIELD REQ
DROP BOXES MUST BE OBTAINED FROM UNITED WASTE SYSTEMS. PH # 4396766
ISSUE DATE: 10/02/96 EXPIRATION DATE: 10/02/97
licant hereby to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
The a»D
Y agT� of
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building
Official of each
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIOD OF 120 DAYS.TERM OF THE PERMIT IS 12 MONTH FROM DATE OF ISSUE.
lLt.aYYI ekulizx_ �. ►cL X
(" BUILDING 0 IC�JAUTHORIZED AGENT Owner or Contractor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS(500.00)OR IMPRISONMENT FOR NOT
MORE THAN NINETY(90)DAYS,OR BOTH.