Loading...
HomeMy WebLinkAboutOT 1998-00548 Fence )^ BUILDING CITY PLUMBING CITY OF OAK PARK HEIGHTS CITY MECHANICAL PLAN REVIEW FE= . 50 14168 57th Street North P.O. Box 2007 STATE SURCHARGE SIGN PERMIT Oak Park Heights,MN 55082-2007 CITY UTILITY(METER) (612)439-4439 UTILITY CCNNEC-ION FEE UTILITY INSPECTION FEE PERMIT NO. OT-98-00548 Use Zone R-1 METROS.A.C. INVESTIGATION FEE Permit Issued For FENCE PARKS CHARGE OTHER 25.00 PERMISSION IS HEREBY GRANTED TOTAL 25 . 50 Owner TIM & KIM FOSTER Contractor 5826 OLDFIELD AVE N OAK PARK HEIGHTS, MN 55082 351-7769 00-0000 To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon the violation of the provisions of said code. JOB ADDRESS I CLASS OF WORK NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH 5826 OLDFIELD AVE N ,may FRONT Or AREA OF SIDE or LENGTH HEIGHT NO.OF TYPE OF MAX.OCC. WIDTH I I IN FEET IN FEET OCCUPANCY I VALUATION I? FEFEET STORIES LOT CCNST LOAD OCCUPIED LOT . V—N R-3 PROPERTY DESCRIPTION: LOT BLOCK AUTHORIZED WORK/SPECIAL CONDITIONS: PROPERTY PINS MUST BE LOCATED & INSPECTION REQUIRED PRIOR TO SETTING POSTS. FENCE ON REAR PROPERTY LINE MUST BE SET IN THREE FROM THE PROPERTY LINE WITHOUT WRITEN PERMISSION FROM THE ADJOINING PROPERTY OWNER. FIRST QUALITY FENCE MUST BE LICENSED WITH THE CITY. 6/11/98 6/11/99 ISSUE DATE: EXPIRATION DATE: The aoolicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the requirements enforced by the City of Oak Park Heights Building Department. I further agree to notify the Building Official of each of the required inspection 24 hours in advance as noted on Inspection Record Card li A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NUt'ND VOID OF THE WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED CAUSPENDED FOR A PERK)* •J OF TH• P MIT IS 12 MONTHS FROM DATE OF ISSUE w x FFICIAUAUT OWED AGENT et. o .nt actor PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE.FINE NOT TO EXCEED FIVE HUNDRED DOLLARS($`C0.00)OR IMPRISONMENT FOR NOT MORE THAN NINETY(9C)DAYS,OR 30TH.