HomeMy WebLinkAbout2014-08-26 Backflow Preventor (RPZ) Test Report - TH Mech Room - Fire System Aug.29.2014 11:03 AM Interstate Testing 763 755 5365 PAGE. 12/ 14
Cross Connection Control Device Performance Test
Interstate Testing
2140 141st Ave. NW.
Andover Mn.66304
Phone(763)7444149
OWNEfAlantl___.....FORM . .
Owner Name Street Address
ritypcs A 0-7---eii /5, n kil: n-tc
e
2ip code Owner%Contact Person Tsiephons Number
IT) rtol AP_ti•-$41.r"fc.4k 7 ( 6S- t) 7 c' •i. 2 c
FACILITY INFORMATION
N. Street Admen
rir Lf; - A ..., • .6A4 el .&.) .".
.641 ZIP ••' COM*
0 A s
1 , 4e C J ..iii■ —
.....ri_il 1--e— 312474e :--7
Monutacturer Modal tam Member
0cJ(7. Ai z ___ pi t " 73
SIZ Assembly Typo .RP U RP Des......._tector 0 pc 0 DC Detector 0 PITS/SVB
IrtAL TEST
hattrtight tfirtight BEZIfig..131IM "
-3, 2.-..._ MID
o Leaked ...., 0 Leaked at nctattopen
Static I c CS MD Static Z k----- MID
gINALIEST
Clawed tot 0 Qum tot Opened at PSID
Static P8113 StatIc MID
%TEMPI BYPASS ASSEMBLY INITIAL TEST
e. bsEIS BetedWitte
llit ieedid light 0 Closed tight PS1D
0 Leaked 0 Leaked )1741ednoattopen
Static PSiD Static MID
DETECTOR BYPASS ASSEMBLY FINAL TEST
0 Closed light 0 Closed tight Opened at PSID
Static PSID Static MID
PRESSURE VACUUM IIREAKER INITIAL TEST ' PRESSURE VACUUM BREAIWIPINAL TEST
Ak.kdet wive iistuaLmahtit
MID •Closed light :Opened at PSID 818altslorit
ardetfopen 51 Leaked Static MO
Static MID
_._
•-
• commENI-s
-----
'2.5 j-
I HEREBY CERTIFY THE TEST RESULTS ARE TRUE AND THE TEST WAS CONDUCTED BY ME PERSONALLY.
Teeter Name(print) Do A DI m dm.. Registration No.0 6C3-2 3 8 rrIme of Day
Teeter Signature C 2 -t..k. fri.--e--e-t Phone No.7 ,3 Date Plahliy