Loading...
HomeMy WebLinkAbout2014-08-28 Report of Inspection - Summit Fire Protection- Extra Dry Pipe Valves SUMMIT Extra Dry Pipe Valves Work Order: 119922 Ft RE PROTECTION This form provides extra dry pipe valve testing notes for buildings with multiple dry pipe valves. This form is in addition to the Dry Pipe Fire Sprinkler Systems form. Owner: Owner's Phone Number: Owner's Address: Property Being Evaluated: Oak Park Heights Senior Living Property Address: 13936 Lower 159th Street, Oak Park Heights„Minnesota Date of Work: August 28,2014 All responses refer to the current work(inspection,testing and maintenance)performed on this date. Notes: I)All questions are to be answered Yes,No,or Not Applicable. All"No"answers are to be explained in Part III of this form. 2)Inspection,Testing and Maintenance are to be performed with water supplies(including fire pumps)in service,unless the impairment procedures of Chapter 15 of NFPA 25 are followed. Dry Pipe Valve: Tyco DPV-1, South 6" Dry Pipe Valve: Tyco DPV-1, North,6" Testing Testing Report any failures on Part III of the Dry Pipe Fire Sprinkler Systems Report any failures on Part III of the Dry Pipe Fire Sprinkler Systems form. form. 1.Annual Tests 1.Annual Tests a.Main drain test for systems not tested quarterly: a.Main drain test for systems not tested quarterly: 1.Record static pressure 60 psi and residual pressure 56 psi 1.Record static pressure 60 psi and residual pressure 56 psi 2.Was flow observed? ❑Yes ❑No I N/A 2.Was flow observed? ❑Yes ❑No ❑N/A 3.Are results comparable to previous tests? ❑Yes ❑No ❑■ N/A 3.Are results comparable to previous tests? ❑Yes ❑No ❑N/A b.Dry pipe valve partial flow trip test(unless full trip test done): b.Dry pipe valve partial flow trip test(unless full trip test done): 1.Initial air pressure 32 psi and water pressure 56 psi I.Initial air pressure 30 psi and water pressure 56 psi 2.When valve tripped,air pressure 13 psi and time 55 sec 2.When valve tripped,air pressure 11 psi and time 37 sec 3.Are results comparable to previous tests? ®Yes ❑No ❑N/A 3.Are results comparable to previous tests? ®Yes ❑No ❑N/A 2.Test for every third year(in addition to previous items) 2.Test for every third year(in addition to previous items) Dry pipe full flow trip test: Dry pipe full flow trip test: a.Initial air pressure psi and water pressure psi a.Initial air pressure psi and water pressure psi b.When valve tripped,air pressure psi and time sec b.When valve tripped,air pressure psi and time sec c.Water delivery time min sec c.Water delivery time min sec Water delivery time not required to be 60 seconds per NFPA 25 Water delivery time not required to be 60 seconds per NFPA 25 d.Are results comparable to previous tests? ❑Yes ❑No ❑N/A d.Are results comparable to previous tests? ❑Yes El No ❑N/A 3.Regular Maintenance Items 3.Regular Maintenance Items a.Have low point drains been emptied? ©Yes ❑No ❑N/A a.Have low point drains been emptied? MI Yes ❑No ❑N/A If so,how many? 1 If so,how many? I Dry Pipe Valve: Dry Pipe Valve: Testing Testing Report any failures on Part III of the Dry Pipe Fire Sprinkler Systems Report any failures on Part III of the Dry Pipe Fire Sprinkler Systems form. form. 1.Annual Tests 1.Annual Tests a.Main drain test for systems not tested quarterly: a.Main drain test for systems not tested quarterly: 1.Record static pressure psi and residual pressure psi 1.Record static pressure psi and residual pressure psi 2.Was flow observed? ❑Yes ❑No ❑N/A 2.Was flow observed? ❑Yes ❑No ❑N/A 3.Are results comparable to previous tests? ❑Yes ❑No ❑N/A 3.Are results comparable to previous tests? ❑Yes ❑No El N/A b.Dry pipe valve partial flow trip test(unless full trip test done): b.Dry pipe valve partial flow trip test(unless full trip test done): 1.Initial air pressure psi and water pressure psi I.Initial air pressure psi and water pressure psi 2.When valve tripped,air pressure psi and time sec 2.When valve tripped,air pressure psi and time sec 3.Are results comparable to previous tests? ❑Yes ❑No ❑N/A 3.Are results comparable to previous tests? ❑Yes ❑No ❑N/A 2.Test for every third year(in addition to previous items) 2.Test for every third year(in addition to previous items) Dry pipe full flow trip test: Dry pipe full flow trip test: a.Initial air pressure psi and water pressure psi a.Initial air pressure psi and water pressure psi b.When valve tripped,air pressure psi and time sec b.When valve tripped,air pressure psi and time sec c.Water delivery time min sec c.Water delivery time min sec Water delivery time not required to be 60 seconds per NFPA 25 Water delivery time not required to be 60 seconds per NFPA 25 d.Are results comparable to previous tests? ❑Yes ❑No ❑N/A d.Are results comparable to previous tests? ❑Yes El No ❑N/A 3.Regular Maintenance Items 3.Regular Maintenance Items a.Have low point drains been emptied? ❑Yes ❑No ❑N/A a.Have low point drains been emptied? ❑Yes ❑No ❑N/A If so,how many? If so,how many? Summit Fire Protection 1 575 Minnehaha Avenue West-St. Paul,MN 55103 I Phone(651)251-1880 1 Page 1 of 1