HomeMy WebLinkAbout2014-11-25 RPZ Rebuild & Test Report (5901 - 5945) - Metro Testing 12-03-14;09: 44A��4; ; # 1/ 1
•
.
MESTN1
Reduced Pressure Zone Backflow Preventer Valve & Double Check (DC) Assembly Valve
Rebuild & Test Report
,L5vil ht
ii
004 - tit gei50-tS 'g?c.( _ ''/ l�Li
t ii..• lir:
i'j°10/- S6)445 noytoiCh __ Qoc lc 'Pari( )-4-6 -S EST t-2 -
Vl/i1KIn5 °x-75 KL- 1 '/z _ 232(eS23
_C`l POL-Na l- use ot. cle door )in:5otfi.6Yl
T ct Yr. Check Valve#1 Check Valve#2 Differential Pressure Relief
1 2 3 4 Leaked ( ) Closed ().0) Leaked ( ) Closed (,.) Did Not Open( )
Over auled ( ) I
Install ( ) Pressure : 5 .(4 Pressure : S Opened At: ,�
R Cleaned Cleaned Cleaned
E Replaced Replaced Replaced
Poppet Poppet Poppet
P Spring Spring Spring
A 0 Ring 0 Ring 0 Ring
Rubber Seat Rubber Seat Rubber Seat
I
Other Repairs Other Repairs Other Repairs
R
S
Certification #2 Shutoff Valve:
I hereby certify the foregoing data to be correct and that the device tested is Pass [1311
functioning within the limits of the standards. ! Fail 7
Signature: di` //t/L---
Date: it/ Assembly Final Test
��1
> Performance:
COLE FORD BF066445 I GARY FORD BF0584761 N FARR aE0664B2'
Metro Testing/Metro Mechanical Consultants,LLC 31222 Cedar Crock Rd,Hinckley,MN 5S037 612.221-5585 Pass ,_
Plumbing Bond License:PC646918 Mechanical Bond Certificate ID:5054-MB t Fail
t►,
This report is for the purposes of recording only: Owner is responsible for safe operation and upkeep of scheduled maintenance.
& /- 4-/-36, -i(74