HomeMy WebLinkAboutDevelopment Application1
A-taii‘i DvQ
CITY OF OAK PARK HEIGHTS +DEVELOPMENT APPLICATION
14168 Oak Park Boulevard
P.O. Box 2007
Oak Park Heights, MN 55082
(651) 439-4439 Fax: (651) 439-0574
Street Location of Property
Owner: Name
Address:
wner/Appli nt Initials
0/
Telephone: (Home)
(Fax)
Base Fee:
Escrow Amount:
Octinvz--
Type of Request(s)
Zoning District Amendment
Conditional Use Permit - Atvl t P. W'
Variance: Single Family Residential
Variance: Other Residential/Commercial/industrial
Subdivision
Subdivision: Minor
Comprehensive Plan Amendment
Description of Request(s):
N Ex/ r
ek
Legal Description of Property
iL /71
2c
City: 0,4K K 1-1P6 I-IR State: Zip: ja721_
Telephone: (Home) 6/-6O
(Fax) (Other)
Applicant: Name
Address:
City: State: Zip:
(Business)
(Other)
Home Occupation
Site Plan Review
PUD: Amendment
PUD: Concept Plan
PUD: General Plan
Street Vacation
City Financial Assistance
ut)
+1,4clo
-- for pianningizoning action on the subject site or any part thereof has been
previously a prov d, please describe it below:
Development Application, Page 2
Application Review
The undersigned acknowledges that before this request can be considered and/or approved, all
required information and fees, including any deposits, must be paid to the City. An incomplete
application will be returned to the applicant. The application approval process commences and
an application is considered complete when all required information and fees are submitted
appropriately to the City.
Professional Fee Responsibility
It is the understanding of the undersigned that all City incurred professional fees and expenses
associated with the processing of this request(s) will be promptly paid upon receipt. If payment
is not received from the applicant, the property owner acknowledges and agrees to be
responsible for the unpaid fee balance either by direct payment or a special assessment
against the property.
Applicants will be billed on a monthly basis for Planning, Engineering, Legal and Community
Development fees as they are accrued. It is understood that interest will be charged on the
account at the maximum rate allowed by the Fair Credit Act if it becomes thirty (30) days past
due. Failure to pay administrative and processing fees in a timely manner may result in denial
of the application. All fees must be paid at the time of application and shall be paid prior to the
issuance of a building permit.
The undersigned applicant further acknowledges and consents that all unpaid fees owing the
City of Oak Park Heights shall be treated as unpaid utility fees and may be certified for
collection as with delinquent utility billings and may be assessed against the subject real
property if unpaid by October 31 of each year.
Property Address
ft t
Applican
»`t
Owner Signature
Signature
General Conditions
Date:
Date:
6/6106
Dear City of Oak Park Heights Community Development Department,
I have met with Greg Monson regarding the Eagle Scout project and am very much in
favor of this project being completed for our athletic teams to use. 1 have met with the
SAHS Grounds Department, District Administration, High School Administration, and
High School Coaches. They are all in agreement this is a worthwhile project and will be
used by various teams during practice sessions.
Thank you in advance for consideration of this project. If you need any more information
please do not hesitate to call. 1 look forward to this being completed as soon as possible
so our Pony teams can begin training with it.
With 'ndest Regards,
Dennis Bloom
Stillwater Are High School
Athletic Director
Dennis Bloom
Stillwater High School
5701 Stillwater Blvd.
Stillwater MN, 55082
•
STILLWATER PONY A THLETICS
Athletic Director
E Mail Office: bloonuWestillwater.k12.mn.us
Office: (651) 351-8001 Home: (651) 436-6356 Fax: (651) 351-8033
Eagle Scout Leadership Service Project
Workbook
Scout's name: Greg Monson
Address: 5257 Jerome Ave. Ct. N.
Telephone No.: 651-777-9090
Unit No.: Boy Scout Troop #162
District: Riverwood
Local council: Northern Star
Unit leader's name: Scoutmaster John Carlson
Address: 4950 Keats Ave, N.
Lake Elmo, MN 55042
Telephone No.: 651-770-6745
Unit advancement committee person's name: Scoutmaster John Callon
Address: 4950 Keats Ave. N.
Lake Elmo, MN 55042
Telephone No.: 651-770-6745
Eagle Scout Project Coach: Greg Peterson
Telephone No.: 651-770-8169
PROJECT DESCRIPTION
Describe the project you plan to do.
At the November 2005 soccer awards banquet, Stillwater Area High School Head Soccer Coach
Phil Johnson mentioned that he wished the current high school athletic field complex had a
soccer ball rebound board similar to the one at the old high school location. He indicated that a
rebound board was a very useful tool for soccer players who wanted to improve their soccer
skills.
I would like to plan, coordinate, and lead a project to construct a 12 by 32 foot soccer ball
rebound wall at the Stillwater Area High School. A rebound wall is a wall that you kick a soccer
ball against and it rebounds back to you. The use of the wall can help improve a player's reaction
time, ball handling skills, and coordination. A workout at the wall would also help improve one's
endurance and overall physical fitness.
The wall would be constructed in an open area at the Stillwater Area High School athletic field
complex. Both sides of the wall could be used at the same time to allow two people or teams to
use the wall at the same time.
What group will benefit from the project?
Stillwater High School soccer program, coaches, and participants would benefit, including both
boy and girl varsity and junior varsity players.
Stillwater High School physical education class teachers and students could use and benefit from
the wall.
When not in use by the high school, the wall could also be used by kids of any age that would like
to train and get better at soccer. Therefore, the wall could benefit the programs, coaches, and
hundreds of kids that participate in the St. Croix Valley Youth Athletic Association and St. Croix
Valley Soccer Club.
The wall could be used by anyone that would like to improve their physical fitness and
coordination, while having fun with a soccer ball.
Name of religious institution, school, or community: Stillwater Area High School
Telephone No.: 651-351-8040
Street address: 5701 Stillwater Blvd. N.
City: Stillwater
State: Minnesota
Zip code: 55082
My project will be of benefit to the group because:
The Stillwater Area high School soccer coaches have wanted a rebound wall at the school for
several years. The wall could be used during practices. The wall could be used in drills that
improve teamwork, reaction time, and first touch.
Soccer players could use the rebound wall during the summer or before and after practice to
improve their reaction time, ball handling skills, shooting accuracy, and coordination.
The physical education classes could use the wall in their classes to play various games that can
improve teamwork, physical fitness, and endurance.
Kids of all ages could go to the school and use the rebound wall to improve their soccer skills or
just to have fun. If you go and use it without a team, the wall makes it possible to have a good
workout while improving your skills.
The kids and teams from the St. Croix Soccer Club and St. Croix Athletic Association could also
benefit from using the rebound wall.
This concept was discussed with my unit leader on (Date): 2-9-06
The project concept was discussed with the following representative of the group that will
benefit from the project.
Representative's name: Phil Johnson
Representative's Title: Boys Head Soccer Coach
Phone No.: Home, 651 Work, 651-351-8761
Email: • •
Date of meeting: January 30, 2006
PROJECT DETAILS
Plan your work by describing the present condition, the method, materials to be used,
project helpers, and a time schedule for carrying out the project. Describe any safety
hazards you might face, and explain how you will ensure the safety of those carrying out
the project.
If appropriate, include photographs of the area before you begin your project. Providing
before-and-after photographs of your project area can give a clear example of your effort.
Description:
Describing the present conditions
The wall would be constructed in an open area at the Stillwater Area High School athletic field
complex. The exact location of the wall was picked out by Head Soccer Coach Phil Johnson and
approved by the Stillwater Area High School Athletic Director Dennis Bloom. The wall location is
in a level, open, grass field.
Method
The attached Time Schedule covers several items of importance including finding out if building
permits are required, contacting Gopher 1 to check for underground gas & electric, and
requesting volunteers from Boy Scout Troop 162 & the high school soccer team. I plan to ask my
dad & two of his friends, my eagle scout coach, and the assistant High School soccer coach to
help. will also contact the Stillwater High School Soccer Booster Club to see if any of the
mernbers would like to volunteer. Most of the equipment will be provided by my dad and his
friends, and my assistant soccer coach who works for a construction company. I will also ask that
other volunteers provide additional equipment that is needed. I will ask that all volunteers bring
leather gloves and recommend that all volunteers wear work boots to help protect their feet.
I plan to have the construction materials delivered to the site by a local lumber yard the week
prior to construction.
Day 1 Wall Post installation (one week prior to wail construction day)
Helpers will include 4 older boy scouts and or soccer team members (minimum age of 14)
5 adults including my dad, my eagle scout coach, the assistant High School soccer coach, and
my mom to bring us food and water.
See safety precautions and safety rules that apply to Day 1.
Read safety rules to volunteers.
Using a Tape measure and a string line, find the center for each of the five 6X6" posts holes (see
diagram for measurements). Mark hole centers with a spray-painted X. Using a rented 12" one
man gas powered post auger, dig the post holes 48 deep. Only the operator will be allowed with
in 10 of the posthole digger while in operation. Put 23" of crushed rock in the bottom of each
hole and tamp with a 2X4. Put an 8 2X4" in one of the end holes. Using a laser level, set the
level at 3 feet above the ground and mark the 2X4". Measure from mark to the desired height of
the bottom of the wall (1 " above ground level) and mark the 2X4. Using the 2X4 as a guide
mark the first 6X6" post at a height of 11'10%" from the bottom wall mark. Keeping the laser level
stationary and using measurement from the laser line to 1" above ground for the first post, repeat
this process for the other four posts. Cut all posts to marked height using a chain saw. The adult
using the chain saw will be required to wear eye and ear protection. All other people on site will
be required to be over 50 from the chain saw and will be asked to cover their ears. Put first 6X6"
post in an end hole. Using a string line and the laser level, square the post with the wall direction
(to get the post facing the right way). Use levels to make the post go straight up and down. Use
8' 2'X6" boards to brace the post in place. Pour the concrete to within W of the top of the hole
and tamp. Repeat the process for the remaining posts. Make sure that they are all facing the
same direction and spaced in accordance to the measurements on the diagram.
Clean up and remove dirt & other construction materials from the site.
Day 2 Pre-Wail Construction Prep (one to two days prior to waif construction day)
Workers will include my dad, 2 other adults, and myself. Guide holes will be pre-drilled in the two
16' 2"X6" top plate boards (4 screws per post). Extension ladders will be placed against post #1
& #3 at an angle that will allow comfortable and safe climbing. Two wooden stakes will be
pounded into the ground at the base of each ladder to prevent kick back and to stabilize the
ladders. Two people who are comfortable climbing ladders and operating drills will put on a tool
belt (used to hold a cordless drill) and screw apron. All other volunteers will be asked to clear the
wall area. These two people will each take an end of one of the top plates and carefully carry it
up the ladders and place it on the top of the wall posts. They will then square the top plate with
the posts and secure with 3" screws. A ladder will then be set against post #2. One person will
climb the ladder and secure the top plate to the post as two other people firmly hold the ladder in
place. The process will then be repeated to attach the second top plate.
While wearing eye and ear protection and using saw horses and a circular saw, my dad will
precut the eight brace boards to be used between the wall posts at a length of 11 1 OW. Using
tap measures, a square and a laser level mark the bottom of the wall location on all the posts.
Using 3" decking screws, attach the bottom two rows of face boards on one side of the wall,
leaving al/4" gap between the rows. The bottom row will consist of two 16' 2x6 boards set level at
approximately 1" above ground and 12' form the top of the top plate (see diagram). The next row
will be one 8, one 16' and another 8' board. Using tape measures, a square and a plumb line,
the location of all of the 2x6" brace boards will be marked on the top plate and bottom wall boards
(see diagram for measurements). Two people will carefully carry, place and hold the first brace
board in place. A third person will put shims under the brace board so that it contacts the top
plate. Using a ladder set against the top plate, a fourth person will then secure the brace to the
top plate and then the bottom wall boards using 3" screws. This process will then be repeated for
all eight of the brace boards to be used between the wall posts.
While wearing eye and ear protection and using saw horses and a circular saw, my dad will cut 6
2X4" 8' pine boards into 12, 4' lengths. He will then cut 3 1X4" 8' pine boards into 12, 2' lengths.
Using 2' screws, we will then attach a 2' 1X4 along the bottom 2' of each 4 2X4. These boards
will be used as safety guides when installing boards to the wall in excess of 51/2' from the ground.
Day 3 Construction Day
Helpers/volunteers will include 6 boy scouts and 6 boys from the Stillwater High School soccer
team. A minimum of 4 adults to assist in the project and help me keep the work site as safe as
we can. My mom to bring us food & water
See safety precautions and safety rules.
Read safety rules to volunteers.
As a safety precaution, only older scouts (14 and older) and adults will be allowed to install
boards over 7' from the ground. Also, I will designate an adult to supervise the movement of the
wood from the wood pile, to the pre-drill station, to the safety line, and to the wall.
A parallel red safety line will be spray painted 10 from wall on both sides. The wood will be
stacked when delivered approximately 30' from one of the wall end posts. Four saw horses will
be set up about 15' from the wood pile & spaced 5' apart. The saw horses will be used to pre-drill
guide holes for the screws used in constructing the wall. Pattern boards will be attached to the
saw horses with screws and be used as a guide for pre-drilling the guide holes. A team of four
people will be assigned to the pre-drilling process (two drillers & two helpers). The two drillers will
select the appropriate board, carefully place it on the saw horses, align with the guide board, and
pre-drill the holes. As the two drillers move back to the wood pile to select the next board, the
two assistants will carefully pick up the pre-drilled board, carry it to the red safety line, and place it
behind the line in the position it will be placed on the wall.
The bottom row will consist of two 16' 2x6 boards set level at approximately 1" above ground and
12' form the top of the top plate (see diagram). The next row will be one 8, one 16' and another
8' board. This pattern will continue all the way to the top in order to stager the splices (see
diagram). Since the wall is 32' wide, we will use precut 8' and 16' boards so no sawing will be
required. We will pre drill pilot holes in face boards for easier and safer screw installation. We
will use 6' step ladders to install the boards up to 814'. We will use 8' step ladders and 10' to 12'
aluminum ladders to install boards from 8 to 12' high.
The people attaching the boards to the wall will work in groups of four, with two installers and two
assistants. Only the installers and their assistants will be allowed inside the red safety line. The
two assistants will pick up a pre-drilled board at the safety line, carefully carry it to the wall, place
it in position on top of the attached board below, place %' spacers in place, and then securely
hold the board in position. The installers will then approach and secure the two ends of the board
with screws. As the installers place screws into the brace boards and/or center posts, the
assistants will return to the safety line to get the next board. When the installers clear the wall
area, the assistants will approach and position the next board on the wall. This process will
continue until the attached boards reach a height of 5
At this point, the safety guides (made during day two see above) will be attached using 3
screws, with the 1X4 end attached to the already constructed portion of the wall. The safety
guides will be placed at 2, 6, 14, 18, 26, & 30' from one end of the wall. Once a board is placed
in position behind the safety guides, the safety guides will prevent the board from accidently
falling and injuring someone. The Safety guides will need to be moved up after every 2' of wall
height.
The assistants will now place their ladders in the proper location, pick up a board at the red safety
line, carry it to the wall, carefully climb their ladders in unison, place the board in position behind
the safety guides, insert 1 /i" spacers, and return to the safety line to get the next board. The
installers will then approach, set their ladders in position, carefully climb the ladder, and secure
the board with screws. This process will continue until the wall is completed.
Pick up site and remove any left over materials.
Budget/Funding
Before talking to Stillwater High School Head Soccer Coach Phil Johnson to see if he would
support the project and be my project representative from the High School, My dad and I looked
at the existing soccer rebound wall at the Stillwater Junior High School (former high school
location). We took measurements, drew a rough diagram, and made a list of projected materials
and rental equipment needed. I then priced the materials and equipment rental to get an
estimated project cost of between $1,800 and $1,900. I told Phil Johnson of my cost estimate
during our conversation on 2-6-06. He indicated that he did not think that the funding would be a
problem, and that he thought the Stfflwater High School Soccer Booster Club would be willing to
provide funding for the project.
ina2-25-06 phone call with Phit Johnson, he indicated that he had discussed the project with the
Soccer Booster Gub and that they were willing to fund the project. However, they requested that 1
price the matera1s at two or three loca\\umberyandsandtry and get the lumber yards to provicle
a discount or donate some of the materials, and I agreed to do this.
Projected Materials
The construction materials were priced at Menards to get a project cost estimate. However, |will
price the materials at two or three local lumber yards and try and get the lumber yards to provide
a discount or donate some of the materials. See above Budget/Funding.
Alt wood is AC2 Pressure Treated
5-8X8^18'—posts 230
7Q-2XO^16'—boards 820
Q-2X8^12'—boards 87
48-2X8^8'boards 240
1 — 5\b —20d nails 5
6 5lb torque drive coated deck screws 114
16 60 pound premixed concrete mix 37
10 -torque drive screw bits 12
2 five gation palis of crushed rock 10
1 —oan red spray paint 3
1 — can yetlow spray paint 3
3 — copies of plan
Pens, pencUs, paper, and ca1cuatorjust in case
1— One-man 1Z^ post auger (rental) 108
1 —Cement mixer 54
1— Chain saw
4-12'ho14' extension ladders
4— anchored kick boards to prevent extension ladders from sli 'ng
6 —6' to 10' stepladders
4 potable dr with extra batteries
4— electric drills
200 feet of extension cords
2 — multi outlet surge protectors
2 — construction squares
4— hammers
3—shovels
4 — saw horses
2 —five gallon pales
1— laser level ontripod
4— hand held levels
1 — really big truck for hauling (may have materials delivered)
1 — pick up truck or trailer to get rid of dirt we dig up
1— circular saw
Price Estiniate (S)
Construction Equipment Price Estimate MI
First Aid Equipment
Fully stocked troop first aid kit (checked & fufly stocked)
Benadryl cream and pills incase of allergic reactions
Clean rags
3 ice packs
Bug repellent
Soap
Sunscreen
35-geUon portable water containers
Plastic cups for people to usa for drinking
Minimum ot 2 ce phones on site & available for emergency calls ifneeded
Map showing directions to the Stillwater Hospital (closest emergency room, about 3 miles away)
Project helpers
Day 1
4 Older boy scouts arid or soccer team members (minimum age o 14)
5 adults including my dad, my eagle scout coach, and the assistant High School soccer coach
My mom to bring us food and water
Day 2
Workers will include my dad, 2 other adults, and myself.
Day 3
6 boy scouts and 6 boys from theBUUvvaterHighSohoolm000arteam-
A mnimum of 3 adults to assist in the project and h&p me keep the work ste as safe as we can.
My mom to bring us food & water
Safety Hazards and Steps to Ensure Safety
NNe will have a fully stocked troop first aid kit to treat slivers, cuts, scrapes, blisters, burns, and
other minor njuries that coutd occur. We wiU have sunscreen to prevent sunburn, bug repelient
to prevent insect bite, and water to prevent dehydration. We wW also have benadry! cream arid
pilis to prevent aUergic reactions. We wiU have ice packs to treat burnps and bruises. We will
have a minimum of 2 cell phones on site for emergency use in case of more severe injuries. In
oddition, we will have a map on site showing directions to the Stillwater Hospital (closest
emergency room, about 3 miles away)
Safety rules
1 will discuss the safety rules before each day of work
1. No jumping off adders or scaffolding
2. 1 person on Iadder at a time
3. No throwing things or other horsepay
4. Where leather gioves when handling wood
5. Be careful of others when moving the wood
O. No waiking under the Iadders
7. Keep wmrkeiteclean
O. Wear eye protection when sawing wood
9. Use eye and ear protection when using chain saw and circular saw
10 Use care when handling drilis and power tools
11 Use common sense
12. Think safety first
Safety Precautions
Day 1
Only allow boys 14 and up to work at site. We are doing this because the posts are heavy and
the young kids are not strong enough. Also, we will be using a lame gas powered posthole
digger and we want to limit the number of people around it when being used. Only the operator
will be allowed with in 10 of the posthole digger while in operation.
Have minimum of 6 people so we can easily lift the posts.
Day 2
Fully covered under project method above.
Day 3
Only allow boys 14 and older to secure the boards over 8' off the ground.
We will pre drill pilot holes in face boards for easier and safer screw installation.
We will use yellow caution tape staked across end of wall to prevent people from walking under
ladders and scaffolding in case people drop the boards.
We will use anchored boards when using extension ladders to keep them from moving
We will keep work site clear and organized
Have a minimum of three adults on site at all times to help with supervision and safety.
If weather is bad we will postpone until weather is better
If thunder and lighting we will leave and reschedule the work for another day
Time Schedule
Projected
Completed
Identify potential Eagle Scout service project — Soccer rebound wall
1-28-06
Start keeping project activity log
1-28-06
Draft wall diagram, make projected material list, and price materials to
get a cost/budget estimate
1-28-06
Discuss & get preliminary approval of potential soccer rebound wall
project from Stillwater Area High School Head Soccer Coach Phil
Johnson
2-6-06
Discuss with Eagle Scout Project Coach Greg Peterson
2-12-06
Complete project concept section of Eagle Scout packet
2-14-06
Obtain required approvals of project concept
2-21-06
Discuss with Phil Johnson & identify potential project ffinding sources
2-25-06
Complete detailed plan section of Eagle Scout packet
6-6-06
&-6-06
Review packet & progress with Eagle Scout project coach Greg
Peterson
6-11-06
Obtain required approvals & signatures for detailed plan section of
6-30-06
12. Think safety first
Safety Precautions
Day 1
Only allow boys 14 and up to work at site. We are doing this because the posts are heavy and
the young kids are not strong enough. Also, we will be using a lame gas powered posthole
digger and we want to limit the number of people around it when being used. Only the operator
will be allowed with in 10 of the posthole digger while in operation.
Have minimum of 6 people so we can easily lift the posts.
Day 2
Fully covered under project method above.
Day 3
Only allow boys 14 and older to secure the boards over 8' off the ground.
We will pre drill pilot holes in face boards for easier and safer screw installation.
We will use yellow caution tape staked across end of wall to prevent people from walking under
ladders and scaffolding in case people drop the boards.
We will use anchored boards when using extension ladders to keep them from moving
We will keep work site clear and organized
Have a minimum of three adults on site at all times to help with supervision and safety.
If weather is bad we will postpone until weather is better
If thunder and lighting we will leave and reschedule the work for another day
Time Schedule
Day 1 construction & clean up
packet
Get signed commitment from Stillwater High School Soccer Booster to 6-17-06
fund the project (Already have verbal commitment)
Find out if a building permit is needed and request permit if required 6-9-06
Price construction materials (done as of 5-10-06) & rental equipment at 6-30-06 5- i006
local businesses, and request donations and/or discounts to reduce costs and
Set dates for construction
Day 2 construction & clean up
Day 3 — wall construction
6-30-06
7-??-06
Notify Boy Scout Troop 162, members of the high school soccer team,
and selected adults of the project dates, and request volunteers
Contact Gopher 1 and arrange gas & electric check 7-??-06
Place orders for materials and rental equipment and arrange for delivery 7-??-06
Contact the volunteers to request and coordinate the equipment to be 7-??-06
brought to the site.
Get portable water containers and troop first aid kit (check & stock if 8-??-06
needed)
8-??-06
8-??-06
8-??-06
SUOISIAGH
As '13
AEI ummia
.1.0
'0N 09[0..id
xxxxx 'ON '
mom IQ .1 Pc
•1.4S .41 oDIQ114Jip1In
Ainp D WD pup uoispuedns
looAlp Aw Japun .1a ow Aq pe.iocloAd
som uoid sig.! lI1 Appoo Ago lati 1
o. f 8.
.7,
a
4b /
X ▪ 6:) 1 = CD CD
/
, ,
NOS.Of 11,4.3
a
ce
0
ONIYHHN.IDAN 7/413 • AVINNY11 311.5" • M1133117-1087 gdEDSCAWY7
L A I
(=) CD CD ,=) 155
u ,
dNI
T3Livii3OSSV
NOSATIOT NOSNAIMV
S1001-10S onend VV 1G 3
iOd3 IN3W30VNVVI S311111,... aitS
SlOOHOS onend VV H3.1VM
1001-10S HSIH yaw Na1V1W1111
0 5 1
2
4 _
91. I.
LO
C\I
1••4S
� 15
9