COMMENTS:
ANDERSON - JOHNSON
ASSOCIATE LVC.
LAADScApE AierfilTEcTURE SITE PL-11V2WIG CITIL ENVINEERtivG
FAX TRANSMISSION
ANDERSON-JOHNSON ASSOCIATES, INC.
7575 Golden Valley Road, Suite 200
Minneapolis, MN 55427
763-544-7129
Fax: 763-544-0531
To: Jeff Carpenter @ Rider-Bennett Date:
India l3oulten @ Rider-Bennett
Phone: Fax:
From: Jay Pomeroy Pages, including
cover page:
Subject: Valley Branch Watershed Permitting
Stillwater Area High School
Please see the attached e-mail from John Hanson from Barr Engineering, a letter (AJA) and
VBWD Permit Review Memorandum from Barr Engineering (VBWD consulting engineer).
trust the information satisfies the City's request.
Jay
cc: Scott Richards - Northwest Assoc. F: 952-595-9837
Kris Danielson - City of Oak Park Heights F: 651-439-4439
IF:›tbi
ff: 67,5i -c3C, Mik
oi8522 P. 1/6
March 26, 2002
612-340-7900
njK 74,
Jay Pomeroy
From:
Sent:
To:
Subject:
Jay-
As you requested, this a short note confirming that the Valley Branch Watershed District (VBWO) Board of Managers
approved a permit for the stadium improvements at the high school. The VBWD permit was approved on March 14, 2002
and is currently being processed. Once the permit is prepared and signed, copies will be distributed to the appropriate
people - including a copy to the City of Oak Park Heights. l believe that the permit that was approved had the same
conditions as included in the draft permit review memorandum that you received.
If you have any questions, please contact meat 952-832-2622.
John
Mar•26, 2Q02 3:04PId AA,
John P. Hanson, P.E.
Barr Engineering Company
4700 West 77th Street
Minneapolis, MN 55435 -4803
952332.2622 (phone)
952.832.2601 (fax)
651148.4230 (Barr's Valley Branch Watershed District Project Office)
www.barr.com
www.vbwd.org
C 6125440531
John Hanson [jhanson @barr.comj
Tuesday, March 26, 2002 11:18 AM
Jpomeroy @ajainc.net
Stillwater Area High School Stadium Improvements
1
No,8522 P. 2/6
•
Mar.26. 2002 3:04PM AJA, INC 6125440531
rim\ rm
BARB
Date: 3/8/02
FaX Number: 763-544-0531
John
Barr Engineering Company
4700 West H" Street g Minneapolis, MN 55435-4803 •
Phone: 952-832-2600 m Fax: 952-832-2601
Minneapolis, MN Hibbing, MN Duluth, MN i Ann Arbor, MI g Jefferson City, MO
Attention: Jay Pomeroy
From: John Hanson
Regarding: SAHS - Stadium Improvements
Fax Only
Facsimile Cover Page
Time: 10:30 Total Number of Pages: 3
Project Number: 23/82-016 6320 007
0 Original to Follow
The information contained in this fax is Wended for the us of the individual named above. If . received in
error, or if the transmission is incomplete, please 06195218324600 immediately and ask tbr
Additionai comments:
Jay
Please review the following memo and let Me Imow your comment& 1 need to mail the memo today in
order for the proica to be discussed a next Thursday's VIEW)) Managors' mooting.
Popoiund TIn Jr Q 19.11DM
No.8512 P. 3/6
ZVOC. th_5 t3t) ILO i 1 r.ui
hr.26. 2002 3:04PM AJA IP
-fly 'J t3 C.LfJV.; t u f 1'" r LEI
BARR
C 6125440531
Barr Engineering Company
4700 West 77th Street • Minneapolis, MN 554,354803
Phone: 952432-21300 • Fax: 952-832-2601
Minneapolis, , MN • Hibbing, MN • Duluth, MN • MA Arbor, MI • Jefferson City, MO
VBWD Permit Review Memorandum
Subject
Date:
Project:
ma rts a I ICS N amv I t r ti3 4 t.9
Stillwater Area High School — Stadium Improvements, knit 2002-01
February 21, 2W2
23182-020 2200
1\1o.8522 P. 4/6
LOCATION Southeast of5 Street and Stillwater Boulevard, Oak 'ark HHlshci
SECTIOWTOWNSHIMANGE NE 1A of the SE IA of Section 6, T29N„ R2OW -
PROJECT PURPOSE Construct bleachers and press box with supporting pavement walks and peas
WATER MANAGEMENT CONCERNS
The proposed project is around the existing track and field. The site drains to "south pond," through Blaokwoods
development, and eventually to Cloverdale Lake. Draioage patterns are not proposed to chi because of the
project. See the attached figure for a schematic of the drainage pats. The project proposes to add 0,9 acres of
new impervious surfaces.
Rate
The project will not increase the peak discharge rates leaving the site. (A 04 ds increase in the peak
discharge rate is estimated for the 10 -year desk storm, but this is less than 2% of an increase and within
modeling error)
Volume
,r--
Vol urn
The a . scant has submitted the s reed storniwater volume checklist. infiltration basins are d,
water Quality
Instead of the traditional water quality ponds with permanent pools of per, the applicant is proposing two
infiltration fiches and one infiltration basin. After runoff drains through these fetes, it is conveyed
through storm sewer to the "south pond," which provides additional water quality treatment prior to the runoff
entering Clovad ale fie.
Flood Layela and Minimum Floor Elevations
No homes are proposed.
WETLAND CONCERNS
No wetlands appear to be within the c oustctron limits.
EROSION CONTROL CONCERNS
Silt fencing is proposed at the appropriate locations. Grading activities should be phased so that the infiltration
areas are cleaned after grading is complete. A disturbed areas should be vegetated within 14 days Of final
E. If material is in to to hauled in and out of the si c, a root constraction entrance should be provided,
SUGGESTED SPECIAL CONDITIONS
1. Drainage easements shall be granted to the City of Oak Park Heights which cover land adjacent to the
pondin wetland area up to its 100.year flood elevations and which cover all ditches and storm sewer.
Acres easements to these drainage easements shall also be granted to Oak Park Heirs, The City of Oak
Park Heights shall be responsible for all maintenance within drainage easements. The 100-year flood
elevation for the infiltration aches and infiltration basin on the site are Elevation 936.0 feet and Elevation
935.3 feet, respectively.
2 The overflow elevation from the upstream infiltration trench to the downstteant imitation trench shall be re,..
evaluated so that the runoff does not spill to the exerting " 2" instead of draining to the proposed infiltration
hn.
Paraivar Ti ma iar. P. 17A !
Mar.26i 2002 3:05PM AJA, f\C 6125440531
I'111 N X r 1.—.e /'sV•r,1
STANDARD CONDJTIONS
:J3 00 ,r1 :'
1; The VBWD Engineer and Inspector shall be notified at least three days prior to commencement of wow
2 Erosion controls shall be installed prior to the commencement of wing operations and be maintained
throughout the construction period until turfy is established. Additional erosion controls may he required,
as directed by the Distlict Inspector or District Engineer.
3 disturbed arm shall be vegetated within 14 days of final grading.
4 This permit is not transferable.
H o 8 511 5/6
IV : i r I D ., ._P 0 1 r •
5. The required drainage easements and mess easements shall be recorded with the Washington County
Recorder's Office.
6 This permit is subject to obtaining all other permits required by governmental envies having jurisdiction
(including a NPDES permit).
R e ivied limp Mgr. 2. 7:O5PM
7. The applicant is responsible for Koval of all erosion control measures including silt fence and hay bales
upon establishment of permanent vegetation at the project site as determined by the 'TBWD Engineer
and/or inspector.
t1ar.26. 2002 3:05PN AJA INC 61 25440531
• G
-T,... .. , . i A z i, 'yam r - i�• .1-•- r t�,C
` .3 -. ti Z
\ a -
tr _ —. _
L ,,, : ..,
',. i r {�+—' a ir fl'' f N. 4 f= i W T CA
..,,......... N \ - ,
y _ <
i = ? • i 4 3 i 1 ra 4
' ... f i = R 4W
l • ,,i,=.44 : s
Z i
v. i'kcr- A
..
x.344
7 �
d �
?PI
t
.v...... ;` s•Y -t
3 M_
411)'
r- °V
ad
.'S.t.? I 74 V
/ _.........!
pa i .
.. S i4
A
:x a
4 ,,,N osi or
..k
acKila
0
■Qi
427'.3
r
•
• C
adarS
Sr4 JFti
.i::7
+1 5
61 'Y
a(
id
5
.
0 II
CO
-4 ! li 1
i
i
i I
F, S L
•
y? 33:.i f
CO V :r
X WO
X a
X
_ 31,-;!=
l
Jo.8522 P. 6/6
VP
� x.57 •{` .: ,
0 * bi
;,,z 3 x.,37 9 it •
C.
X '11,5 ;: r y $,' �a a ,i i
Xi ,33,E ' / M ,
/ wa /
t1
x y;•� k
1
r
t i7tiR
�
r
�r & 2 .036. r x V*
s '
1
i
L ra N.k 1 ~, !
N '\ i
�L W4 r. -Y
K ems `,.