HomeMy WebLinkAbout2003-02-19 Fire Guard Sprinkler Service Inspection Report E GUARD INSPECTION
G OF PGS.
t`R FIRE-GUARD CONTRACT NO.
JSPECTIONr M A ?.?
w- 'RINKLER SERVICE,INC.
EPORT NO. •2 z w 205 White Bear Ave.No.,Suite C MN LICENS 40: BUREAU
F�
St.Paul,Minnesota 55109 C00018 FILE NO.
:ONFIRMED �j 9 PH:651-748-9499 • FAX:651-748-9143
11TH
-- ----------
BLDG.NAME
O- - r c -
?EPORT TO
ADDRESS: 1 `7 a ' e r � tf
,ITY.ST s r' l Pf-- / v Ian Ai
CITY,STATE,ZIP: 1 y K
;ITY.STATE,ZIP: f 0 /J � DATE: a //?/e3
,I Pi LICENSE NO.
TECHNICIAN:
OWNER'S SECTION(To be answered by owner or occupant) 49‘/6 G N/G
A.Explain any occupancy hazard changes since the previous inspection. 111111--." v�'�-7i�v/c1i 11
V n E1/ _ 11111
a
B.Describe fire protection modifications made since last inspection. M,"
1�1�■��a�ts!'1.1!�ill�ll
� �l��
C.Describe any fires since last inspection._�.— -.- �
D.When was the system piping last checked for stoppage,corrosion or foreign material?
E.When was the dry-piping system last checked for proper pitch?
Agjii
F. Are dry valves adequately protected from freezing?
_ yes n.a. no
c. Has the operation of the air or nitrogen supply
yes. n.a. no been tested?
INSPECTOR'S SECTION(All responses reference current inspection) J��µ�� Is it in service?
1. GENERAL !!" d.Were low points drained during this inspection?
a.AIs re e a building occupied?n svic i e.Did quick-opening devices operate satisfactorily? /4. -
b.Are er systems minim in service? f. Did the dry valve trip properly during the trip pressure test?
c.Is there a minimum the 18 ri sprinkler mm)clearance between the top g.Did the heating equipment in the dry-pipe valve room operate
of the storage and the sprinkler deflector? at the time of inspection?
d. In areas protected by wet system,does the building appear to be
properly heated in all areas,including blind attics and perimeter 7 SPECIAL SYSTEMS(See item 16)
areas,were accessible?Do all exterior openings appear to be
a.Did the deluge or pre-action valves operate properly during testing?•
protected against freezing? ? °, b. Did the heat-responsive devices operate properly during testing? R
e. Does the hand hose on the sprinkler system appear satisfactory? c.Did the supervisory devices operate during testing?
2. CONTROL VALVES(See item 14) 8. ALARMS pC
a. Are all sprinkler system control valves all all other valves in the A A.LA AR RM Mater motor and gong test satisfactorily?
appropriate open or closed position? k b. Did electric alarm test satisfactorily?
ae
b.Are all control valves in the open position and locked,sealed or c. Did supervisory alarm service test satisfactorily?
equipped with a tamper switch?
3. WATER SUPPLIES(See item 15) ? 9. SPRINKLERS
a.Are all sprinklers free from corrosion,loading or obstruction to spray ote
a.Was a water flow test of main drain made at the sprinkler riser? discharge?
4. TANKS,PUMPS,FIRE DEPARTMENT CONNECTIONS r b.Are sprinklers over 50 years old,thus requiring sample testing?
K c. Is stock of spare sprinklers available?
a. good pumps, nd properly perly tanks,maservoes and pressure tanks in d.boos the interior condition of sprinkler system appear to be
good condition and property maintained? satisfactory?
b. Are fire department connections in satisfactory condition, .
couplings free,caps in place,and check valves tight?Are
they accessible and visible? 10. Date dry-pipe valve trip tested(control valve partially open)
(see trip test which follows) ec
5. WET SYSTEMS(See item 13)
a. Are cold weather valves(O.S.&Y.)in the appropriate open ee 11. dry-pipe Date dry pe valve trip tested(control valve fully open)
(see trip test which follows)
or closed position? el
b. Have antifreeze systems solutions been tested?
c. Were the antifreeze test results satisfactory? O. 12. Date quick-opening device tested(see ASCOA trip test report)
6. DRY SYSTEMS(See items 10 to 14 and attached report) "\ 13. Date deluge or preaction valve tested
a.Is the dry valve in service? 14. See Control Valve Maintenance Table.
b. Are the air pressure and priming water level in accordance OL
with the manufacturer's instructions?
CONTROL MAINTENANCE TABLE
Control Valves Number Type Open Secured Closed Signs f
Explain Abnormal Condition
Control Valves / C S N t'/L� s
Other Control Valves / 7 jy/ v ej 1&.1 15.WATER FLOW TEST ,
Flow Pressure
Test Pipe Size Pressure Flow Pressure Test Pipe Size Pressure Pressure _ After
Located Test Pipe Before Pressure After Located Test Pipe . Before _
/,�,SC .� 1:7-,r— z " 7 3-`/ 7Y - -
Condition:.____
16.Type of Equipment C Model:Condition:
ion:_. " F
Manufacturer. Location? Test Result'?
Auxiliary Equipment:No? Type?- / /
17.Explain any"No"answers and comments: /Lit c J G C / (
18.Adjustments or corrections made during this inspection:
f;L =3
19.Although these comments are not the result of an engineering review,the following desirable improvements are recommended:
W'-IITE:CLIENT YELLOW:OFFICE PINK:INS:, NCE AUTHORITY