HomeMy WebLinkAboutBP 1998-00391 Interior Draintile System "Aft...0N �'.
CITY 9U*LDING 99.75
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
PLAN REVIEW FEE
14168 57th Street North 2 . 50
STATESURC,ARGE
P.O. Box 2007 SIGN PERMIT
r
Oak Park Heights,MN 55082-2007 '
(612)439-4439 cm UTILITY(METER)
UTILITY CONNECTION FEE
UTILITY INSPECTION FEE
BP-98-00691 R1A METROS.A.G.
PERMIT NO. Use Zone
INVESTIGATION FEE
Permit Issued For INTERIOR DRAINTILE SYSTEM PARKS CHARGE
OTHER
( PERMISSION IS HEREBY GRANTED TOTAL 102. 25
Owner WARREN & ANN WASESCHA Contractor QUALITY BASEMENT WATERPROOFING
5675 NEWBERRY AVE N 280 S ORONO ORCHARD RD
OAK PARK HEIGHTS MN 55082 WAYZATA MN 55391
00-0000 612-476-1601
To carry out the work specified on the following described property,upon the express condition that said persons and their agents,employees
and workmen,in such work done,shall conform in all respects to the provisions of the Building Code.This permit may be revoked at any time upon
the violation of the provisions of said code. .
JOB ADDRESS I CLASS OF WORK
NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH
�
5675 NEWBERRY AVE N X
FRONT or AREA OF
WIDTH 510E or LENGTH HEiGnT N0.OF LOT TYPE OF MAX.CCC:
- IN FCC: ( IN FEET ( IN fEE STORIES OCCUPIED CCNST OCCUPANCY LOAD VALUATION
,.
V-N R-3 5,000
1 O.
PROPERTY DESCRIPTION:
LOT BLOCK AUTUMN RIDGE
Ii
AUTHORIZED WORK/SPECIAL CONDITIONS:
INSTALL PER MANUFACTURER SPECIFICATIONS, PER MN STATE BUILDING CODE AND
LOCAL ORDINANCE REQUIREMENTS
12/0, i i2.40119(1
.44-/-4491-9.8 .44/ ,.,.
ISSUE DATE: EXPIRATION DATE:
The avnlicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY.'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIOD OF 120 DAYS.TERM OF H PERMIT IS 12 MORT4S FROM DATE OF ISSUE
O. BUILDING OFFICIAUAUTHORIZEDAGENT r or Contrac r
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE FINE NOT TO EXCEED FIVE HUNDRED DOLLARS;SECC CO)OR IMPRISONMENT FOR NOT
MORE THAN NINETY(9C)DAYS,OR 20TH.