PLANNING REPORT
f 11 E
TO: Eric Johnson C�p�
FROM: Aaron Jones / Scott Richards
DATE: Jul 2, 2003
RE: Oak Park Hei — Stillwater Area Hi School CUP Amendment
FILE NO.: 798.02 — 03.09
BACKGROUND
Stillwater Area Hi School is re an amendment to their existin CUP to allow
for the installation of bleacher seatin at the athletic fields. The bleachers would be
installed upon concrete bases at the fields. It is anticipated that similar bleachers would
be installed in the future at the two baseball fields and at the tennis courts. Fundraisin
for these projects has not officiall reached completion.
Attached for reference:
Exhibit A: Memo from School Staff
Exhibit B- Site Plan with Bleacher and Concrete Pad locations
Exhibit C: Photo example of proposed bleachers
ANALYSIS
Existin Conditional Use Permit. The ori Conditional Use Permit for the Hi
School was approved December 10, 1991. The applicant is re an amendment
to this existin CUP in order to provide bleacher seatin to athletic spectators.
Bleachers. The bleachers are proposed to be built on the hi school softball fields.
The bleachers will be constructed of aluminum frames, seat planks and foot planks.
The three softball fields will have 2 five-row and 1 ten-row bleachers. The baseball field
and tennis court bleachers will also be aluminum and will not exceed ten rows. All
bleachers constructed and placed upon the fields and courts will meet the re
of the Minnesota Bleacher Safet Act.
Concrete Bases. The bleachers will rest upon concrete bases that will provide stability
and allow for efficient maintenance of the grounds around them. The concrete bases
for softball fields 2 and 3 will be 15 feet by 21 feet (315 square feet) and will be set
behind the backstop. The bleachers for this site will have five rows and seat 70 people.
The concrete base for softball field 1 will be 20 feet by 21 feet (420 square feet) and will
be set along the blacktop behind the backstop. This bleacher will have 10 rows, and
seat 140 people.
Tinleine. The bleachers for the softball fields will be installed by the Booster club the
Summer of 2003. Bleachers for all the fields would be installed by 2000, however
funding will determine the schedule for the baseball field and tennis court bleachers.
The city council, as part of their resolution on this issue, will extend the approval to
December 31, 2005 to allow completion of all the bleachers under this approval.
Lights 1 Parking 1 Traffic. There are no lights on the fields or tennis courts. Parking
and traffic should not be affected by the installation of the bleachers. The bleachers
would be used by spectators for activities that occur primarily after school or on non
schooldays.
Shade Tree Planting. staff would suggest the city Arborist review the proposed
bleacher site plan for the location of shade trees near each of the bleachers.
Is 1'
Based upon the preceding review, our office recommends approval for the CUP
amendment to allow bleachers at Stillwater Area High school subject to the following
conditions:
1 The bleachers shall be constructed in compliance with the Minnesota Bleacher
Safety Act and the Building code subject to approval of the Building official.
Z The bleachers as proposed shall be completed by December 31, 2000,
3. The city Arborist shall comment on the need for shade trees adjacent to each of
the bleacher locations.
18 75 South Greeley Street
Stillwater, Minnesota 55
Tel: 651-351-
fax: 6 5 1 - 35
tdd: 6 5 1 - 351
www. st i l twat e r. 1(12 . rn n. us
STILLWATER June 18, 2003
AREA
5CHO 3LS
Pe: Request for Amendment to conditional use Permit for installation of bleachers on
Stillwater Area High School Athletic Fields.
Enclosed is application for an amendment to the Conditional use Permit issued by the city
of Oak Park Heights on December 10, 1991. The school district requests this amendment
to install bleachers on concrete bases at the fields identified on Exhibit 1 .
A booster club has offered to purchase and install three sets of bleachers on the high
school softball fields. The funding for these bleachers is in place and they are ready to
proceed. Please see Exhibits 2 and 3. In addition, the District anticipates that similar
bleachers would be installed in the future at - the two baseball fields and at the tennis
courts. Fundraising for these projects has begun but is not complete at this pointy
Will be constructed of aluminum frames seat planks and foot planks. The three
softball fields will have 2 five - row and I ten - row bleachers. The baseball field and - tennis
court bleachers will also be aluminum and will not exceed ten rows. All bleachers will meet
the requirements of the Minnesota Bleacher Safety Act.
C oncrete gases
The bleachers will sit on concrete bases for stability and to allow for efficient
maintenance of the grounds around them.
Tf i - np l i n P
The booster club plans to install the softball bleachers this summer (2003). Funding
will determine the schedule for the baseball fields and tennis courts. All phases would be
completed by September 2006.
Ligh 1 Parisi n g 1 T c
There are no lights on the - fields or tennis courts. Parking and traffic will not be
affected by the installation of bleachers. Activities on the fields draw small attendance
numbers and happen after school or on non school days.
Sincerely,
Michael BrabEnder
Supervisor of Operations
Stillwater Area Schools
' r;l
i
i
� J
EXHBIT A
Afton-Lakeland Elementary, Andersen Elementory, Early Childhood Family Education, Lake Elmo Elementary, Lily Lake Elementary, Marine Elementary,
Oak Park Elementary, Oak -Land Junior High, Rutherford Elementary, St. Croix Malley Alternative Learning Program, .Stonehridge Elernenrary,
Stillwater Area High .School, Stillwater Junior High, Valley Crossing C.otnmw7ity sChooi, Withrow Elementary
in
0
Ali
UP)
LLJ
-4
P
vi
gV40H
EXHIBIT B
C�)
CA
L
F�
f t
n
y C�
r er..� L
L
F
t•: :ti � rY
L ow Rise Bleachers
Standard Bleachers
Preferred Bleachers
Deluxe Bleachers
Elevated Bleachers
Tip N' Roll Bleachers
Transport Bleachers
Bleacher Features
Replacement seating
Benches
Picnic Tables
Seating Plans 1
Seating Flans 2
Dimensions
Architectural Spec
National Recreation
Systems, Inc.
51 20 Investment Drive
Fort Wayne, IN 40808
f 888- 508 - / 9 ' 064
i o - V 0
200 - 482 -7449 fax
"T ID'ES
"SAL 1W,
_"rSE
EAT I iN T I E _v O'vu'
Our "Preferred" (non - elevated) aluminum bleachers provi
quality construction at an affordable price. 3 Row rnodels r
under 30", therefore most building codes do not require guard
All "Preferred" bleachers 5 rows and higher include riser plc
under seat row 4 and above, plus chain link guardrail to cic
all spaces over 30" above grade to less than a 4" openinc
• • vr•.^ ..:::::...... .. ....:.::::... : :titi• t 4 t
• Y • 1 ' .' 'ti,. -..:411 ...L . .. - '.'...:'. •:':'::•:•' ::':•: :' ::':': � LL :.\ ~':�4' y.���
{l}. {rte •{ _•.'. .Y:.. •:.� • '.1jLVr:.'_.'.'.':'�' 1••' ' ` ' • :'.'::::.' :.':: _':.'.4':.'.'_'_ .':.':.•.' _ ..ti :. � . {\�Wr �'Sti��� n
}tit { � `.1M1'. � -YY:':::: _i'- 1'r':.•: ::.:•.':.'. •: .1•.: � . � l:::. � . }'::.LL:' :;�:'ti1:':l� tititi '~�.
S ••�'::':,:' _'.t':': :•:..;.. '; :.:::•:: titi•: � • �����1 L
r. 1 L r •'•' . }r. : {:::::::.r:: r: r.-.�.�_ r: r:::•:-::.-.•::.. ., �...._. { ?::•::: {:.:•.:' :•:•+:��:{• }:'`'ti: {•r};,ti• - 71L
�f� ?�.1 �C };:, t ✓ v� WL 1.1 . ..'::.: :.•t:.:: h :.'v..ti_:1.:; • ::.1_.• -X -X : N%% 1 f{:�''r: Vfti:•.
-�r {:.:::.:.. }{4 vr.:•.} :` :::r;:r }:::v_: }}ti::.:{ ti {' '.:-: }�- � r y :.} . :.ti } }} ..ti }, : v,4 r n :.Lti}} .} r .'
•} {'.:.:: }::' {• v .•.• : ..t•: `.:. {..... ::::::.•:::::::: "r,.- .v.::•. � ::' :•:::•::.•: titi :.•. �::.ti
�C� : 'r �' _ .1•:. :. ! ; }• }{ . '•::�ti ::::.s :. ' ::::'::::•:':•::::•::., ti_.}:.'.Lti .•: }titi r:..�v.L
` } .}'r7xti {�+Yi •::•:•:•.ti {•.y r ,4$ : _' � .... - 'r::.ti•Y`'•'•::.::::•r •_L :•::. .::•:::.•_•: r::::: :::.}}::-:. _ _.; •rn•:..:ti•. rykt�.' "., :•.
S�'.y�t�`' •rL1 1'.': '.} ::t ::•: .'�':S'.1Vr::.1•..} :;.:::':ti': }:•t:':'.: :•_t :•: ti: �' ::.ti'l.• �, •..:.. :ti . :.:•l:l �:��';t ' 1• r
} :.............. WN
1 ti :•. n,, v :•'{. _•:.' :: " ...•: .•:.•.-.;{ }' {iti7{{{`:. ::: •'• " •" - :..:•..; v �.: -: :.titi
•r:
_ L
•:i•:•. vvvwvw.v.^rrr.1
ti .. • v v ti� {�{ r{fiCti ' •L ' V
10 Row Preferred EXHIBIT C
Anodized aluminum seat planks, mill finish aluminum
foot & risen planks, all- aluminum guardrail with chain lint{
and your choice of aluminum or galvanized steel fr2mewo
All bleachers should be anchored to
resist wind loads. Contact us for details
All "Preferred" bleachers include (2) mill finish 211 X 10 foot pl
Most codes (UBC, SBC, BOCA, NFPA, IBC) require 2 foot pl,
3 Row Preferred
5 Row Preferred